FIELD: engineering of synchronization systems, possible use for engineering and setting up networks of clock network-based synchronization of communication operators, which have mounted primary standard generators.
SUBSTANCE: system has leading primary standard generator, containing n devices for measuring phase deviations, n primary standard sources, n synchronization devices with phase-based frequency automatic-adjustment and secondary set-point generator, where n - any number greater than 2.
EFFECT: synchronous operation of two and more primary standard generators, mounted in network of clock network synchronization without worsening of both their frequency and phase characteristics.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
SLAVE GENERATOR SYNCHRONIZATION SYSTEM | 2021 |
|
RU2770459C1 |
SLAVE GENERATORS SYNCHRONIZATION METHOD | 2021 |
|
RU2771086C1 |
METHOD FOR NETWORK CLOCK SYNCHRONIZATION OF GENERATORS | 2001 |
|
RU2199178C1 |
METHOD FOR LOCK SYNCHRONISATION OF GENERATORS OF RAILWAY DIGITAL COMMUNICATION NETWORK | 2009 |
|
RU2399155C1 |
METHOD FOR SYNCHRONISATION OF LINEAR TRANSPORT NETWORK BUILT AS BASED ON SYSTEM OF SYNCHRONOUS DIGITAL HIERARCHY TRANSFER SYSTEM | 2009 |
|
RU2405264C2 |
METHOD FOR SYNCHRONIZING TRANSPORT RING NETWORK BUILT AROUND SYNCHRONOUS DIGITAL HIERARCHY SYSTEM | 2005 |
|
RU2300842C2 |
REFERENCE FREQUENCY AND TIME SIGNAL FORMER | 2015 |
|
RU2592475C1 |
METHOD TO ORGANISE EMERGENCY MODE OF MULTIPLEXER OPERATION AND DEVICE THAT REALISES IT | 2010 |
|
RU2427882C1 |
METHOD AND CONTROL CIRCUIT FOR DIGITAL-PROCESSING PHASE-LOCKED LOOP FOR NETWORK SYNCHRONIZATION | 1995 |
|
RU2154895C2 |
DEVICE FOR MEASURING BIT ERROR COEFFICIENTS IN FIBER-OPTIC COMMUNICATION LINES | 2004 |
|
RU2263402C1 |
Authors
Dates
2006-02-20—Published
2004-05-05—Filed