FIELD: bridge building, particularly to erect bridge piers in rivers to be covered with ice and subjected to ice drift.
SUBSTANCE: rigging comprises support system including cross-beam and leading piles to which rigid frame with guiding means for posts is connected by upper beam system. Rigid frame is made as parallelepiped with bottom having orifices for post passage with removable water-tight heat-protective side walls connected with bottom and one with another through packing means. Upper beams connected with removable water-tight heat-shielding side walls by sectional connection means are provided with rests to connect thereof with support system cross-beam. Guiding means for posts are secured in bottom from bottoms thereof.
EFFECT: reduced material consumption and labor inputs during high pile grillage constriction.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
EQUIPMENT FOR HIGH GRATING OF BRIDGE PIERS BUILDING | 2003 |
|
RU2250948C1 |
METHOD OF CONSTRUCTING BRIDGE SUPPORT GRILLAGE IN RIVER WATER AREA | 2023 |
|
RU2809068C1 |
PROTECTIVE CASE FOR BRIDGE PIER GRILLAGE AND ERECTION METHOD THEREOF | 2004 |
|
RU2263176C1 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD OF BRIDGE BUILDING OVER WATER BODY | 2004 |
|
RU2237123C1 |
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION | 2003 |
|
RU2244067C1 |
BRIDGE FOOTING | 2001 |
|
RU2209870C1 |
UNIVERSAL TRANSFORMABLE CASING FOR MAKING EXTENSIVE BUILDING STRUCTURES, EXTENSIVE BUILDING STRUCTURE, COLLAR BEAM AND LONGSPAN BEAM MADE IN SAID TRANSFORMABLE CASING | 2005 |
|
RU2289006C1 |
FORM FOR ELONGATED BUILDING STRUCTURE PRODUCTION OF REINFORCED HARDENING MATERIAL, ELONGATED BUILDING STRUCTURE AND LARGE-SPAN BEAM PRODUCED WITH THE USE OF THE FORM | 2005 |
|
RU2315842C2 |
Authors
Dates
2006-04-27—Published
2004-02-10—Filed