FIELD: hydraulic structure building and repair, particularly to construct and repair power tunnels of hydroelectric plant.
SUBSTANCE: method involves forming concrete tunnel lining; consolidating ground around concrete liner by injecting grouting mortar in rock and forming damping layer between concrete lining and grouted ground. Damping layer forming between concrete lining and ground is created after tunnel filling with water under working pressure and after concrete lining curing under water pressure for 1.5-2 years. After that water is discharged and gaps between concrete lining and grouted ground are detected. Damping layer is created by plugging space beyond the lining by injecting resilient grouting mortar in spaces between outer lining surface and ground massif. The resilient grouting mortar has modulus of elasticity equal to intermediate value between that of concrete lining material El and that of ground massif Eg.
EFFECT: increased tunnel service reliability due to reduced loads applied to lining.
Title | Year | Author | Number |
---|---|---|---|
ERECTION OF TUNNELS IN STRUCTURALLY UNSTABLE SOILS WITH KARST PHENOMENA AND/OR BOIL PROCESSES | 2013 |
|
RU2537711C1 |
METHOD TO ERECT UNDERGROUND MINE WITH SHIELD TUNNELLING | 2011 |
|
RU2476675C2 |
TUNNELING METHOD | 2004 |
|
RU2259479C1 |
SUPPORT FOR SUBMERGED STRUCTURE | 2015 |
|
RU2584174C1 |
METHOD FOR MONITORING THE TECHNICAL CONDITION OF THE TUNNEL LINING USING THE SEISMOACOUSTIC METHOD | 2022 |
|
RU2791457C1 |
UNDERGROUND ANTIEJECTION CHANNEL OF NUCLEAR POWER INSTALLATION | 1992 |
|
RU2067782C1 |
METHOD TO CREATE ROCK SUPPORT OF MINE | 2012 |
|
RU2498073C1 |
METHOD OF PROTECTION OF KARST OCCURRENCE | 2013 |
|
RU2543162C1 |
METHOD OF PREPARING INUNDATED KIMBERLITE PIPE FOR UNDERGROUND MINING | 1999 |
|
RU2153072C1 |
METHOD OF PROTECTING TUBULAR DRAINS OF CONCRETE STRUCTURES FROM INGRESS OF CEMENTING COMPOSITION | 0 |
|
SU1092237A1 |
Authors
Dates
2006-05-27—Published
2004-12-15—Filed