FIELD: mining operation.
SUBSTANCE: method of protection of karst occurrence comprises drilling wells in the area of karst formation and injection of reinforcing material. While injecting the reinforcing material in the form of a polymer-mineral composition in the rock mass of the area of karst formation two layers are created: the lower insulating-stabilising layer which prevents access of water to the karst at the depth of occurrence of karst rocks and stabilising the situation at the stage of karst formation, located within the boundaries of the sliding wedge, and the upper bearing layer serving as a bearing local layer and corresponding to the width of the lower layer. Drilling wells is carried out sequentially - first inclined well is drilled to the upper transition zone of the geological horizon exposed to karst formation, the polymer-mineral composition with the capacity from 2 to 10 meters is pumped, which forms a lower insulating-stabilising layer, then the inclined well is drilled to contact with the upper boundary of groundwater, and the polymer-mineral composition with the capacity from 2 to 5 meters is pumped, which forms the upper bearing layer. Then the control vertical well is drilled to contact with the upper bearing and the lower insulating-stabilising layer. The core-sample is raised from each layer to check the presence of the polymer-mineral composition. Between the bearing and the insulating-stabilising layers in the rock mass the channel of flow of groundwater from the water collection area to the discharge area is formed, preserving the natural hydrogeological mode in the rock water-bearing mass of the karst formation area.
EFFECT: increase in protective properties of rocks with karst occurrence, improvement of physical and chemical and bearing properties of the soil, increase in the strength properties of the soil, reduction of the possibility of landslides occurrence.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
REINFORCEMENT METHOD OF FOUNDATIONS OF BUILDINGS ON STRUCTURALLY UNSTABLE SOILS AND SOILS WITH KARST FORMATIONS | 2013 |
|
RU2537448C1 |
METHOD FOR REINFORCEMENT OF LINEAR OBJECTS ON SINK HOLE-HAZARDOUS AREAS | 2015 |
|
RU2581851C1 |
METHOD FOR CREATING INTRAGROUND PROTECTION OF HYDRAULIC STRUCTURES IN CRYOLITHOZONE | 2022 |
|
RU2804631C1 |
METHOD OF FOUNDATION REINFORCEMENT | 2009 |
|
RU2410492C1 |
METHOD FOR STRENGTHENING STRUCTURALLY UNSTABLE SOILS WITH KARST FORMATIONS AND/OR WATER-SATURATED SOILS USING MICROPILES AND INJECTORS FOR FORMING MICROPILES | 2022 |
|
RU2795924C2 |
METHOD OF SOIL REINFORCEMENT | 2010 |
|
RU2439246C1 |
METHOD FOR KARST DEFORMATION LIQUIDATION SALT DUMPS | 2006 |
|
RU2307250C1 |
METHOD FOR DETERMINING ZONE OF POSSIBLE SAGGING OF SOIL | 0 |
|
SU767276A1 |
METHOD FOR ELIMINATING LEAKS AND INCREASED FILTRATION OF SOIL HYDRAULIC STRUCTURES | 2020 |
|
RU2754380C1 |
POLYMERCEMENT COMPOSITION, METHOD OF FILLING VOIDS BY MEANS OF SAID COMPOSITION (VERSIONS) AND DEVICE FOR METHOD EMBODIMENT | 2000 |
|
RU2182566C1 |
Authors
Dates
2015-02-27—Published
2013-04-09—Filed