FIELD: ground excavation and pit and open-cast mine formation to erect hydraulic structures, large objects and deposit development.
SUBSTANCE: method involves marking open-cast mine contour; excavating ground in layers along with stepwise cutting of each layer; forming spiral transport ledge in open-cast mine slope and removing ground, wherein each layer at layer perimeter is provided with trench; simultaneously forming permanent spiral transport ledge in outer trench slope; installing continuous-type ground excavation rig in trench; cutting ground of each layer along spiral line in direction from layer periphery to center thereof; removing cut ground by length-adjustable vertical and horizontal conveyers, wherein horizontal conveyer lengths are decreased in each layer as diameter of layer to be cut increases and vertical conveyer length is increased as open-cast mine depth increases. Spiral transport ledges of all layers form common continuous inclined spiral line.
EFFECT: increased simplicity and reduced time of open-cast mine development, reduced costs of ground excavation and disposal, provision of continuous work cycle.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
OPEN-CAST MINE DEVELOPMENT METHOD | 2005 |
|
RU2278265C1 |
DITCHING AND TRANSPORTING RIG FOR LAYERED PIT EXCAVATION | 2005 |
|
RU2284415C1 |
PROTECTIVE SHIELD, FORMED DURING LAND RETROFIT, AND METHOD OF FORMATION THE SAME | 2017 |
|
RU2663430C1 |
SEEDING BAND AND COMBINED AGGREGATE FOR SEEDING PLANTING STOCK IN BANDS | 2008 |
|
RU2379872C1 |
METHOD FOR OPEN-UNDERGROUND DEVELOPMENT OF FLAT-LYING FORMATIONS | 2019 |
|
RU2715503C1 |
METHOD OF MINERAL EXTRACTION IN FILLED FLANKS OF OPENCAST | 2001 |
|
RU2205955C1 |
OPEN-PIT MINING METHOD FOR STEEP AND INCLINED DEPOSITS | 0 |
|
SU1735585A1 |
METHOD FOR DEVELOPMENT OF TROUGH-LIKE DEPOSITS | 0 |
|
SU1735587A1 |
QUARRY DEVELOPMENT METHOD | 1996 |
|
RU2118456C1 |
METHOD OF OPEN MINING OF CRYOLITHIC ZONE FIELDS | 2014 |
|
RU2575283C1 |
Authors
Dates
2006-06-20—Published
2005-05-05—Filed