FIELD: laying electric service lines across water obstacles.
SUBSTANCE: proposed method involves cable laying in plastic pipeline. To this end plastic pipes are first welded together on land with cable and ground wire or wires gradually drawn through them; then pipeline incorporating cable and ground wire or wires is pushed to water and conveyed toward transition point on bank. Pipe is secured on bank for movement and transported to opposite laying point with reference to pre-installed buoys at the same time arranging it on underwater route. Upon fixation of other end of pipe for displacement this pipe is unsealed for water admission therein, gradually laid on bottom, and secured thereon.
EFFECT: reduced anthropogenic impact time, ability of protecting underwater communities of water reservoir.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND LAYING OF CABLES AND POLYETHYLENE PIPING THROUGH SHORELINE | 1999 |
|
RU2164050C1 |
METHOD AND DEVICE FOR UNDERWATER ROUTING OF CABLES AND POLYETHYLENE PIPELINES BELOW BOTTOM ELEVATION OF WATER RESERVOIR | 1999 |
|
RU2165121C1 |
METHOD OF LAYING UNDERWATER PIPELINE | 0 |
|
SU1002466A1 |
DEVICE FOR PRODUCTION OF SAPROPEL OF NATURAL MOISTURE | 2010 |
|
RU2447234C1 |
METHOD TO CONSTRUCT AND REPAIR WATER CONDUITS AND HEADERS OF SHALLOW WASTE WATER ON BOTTOM OF RIVERS AND WATER RESERVOIRS | 2011 |
|
RU2465408C1 |
DEVICE FOR MAKING UNDERWATER WORKS | 2016 |
|
RU2612421C1 |
METHOD OF UNDERWATER HYDRAULIC DEPOSITION OF GROUND | 2001 |
|
RU2187596C1 |
METHOD OF LAYING UNDERWATER PIPE-LINE | 0 |
|
SU1423852A1 |
METHOD TO INSTALL MARINE UNDERWATER CABLES | 2010 |
|
RU2444827C1 |
METHOD TO INSTALL UNDERWATER PIPELINE | 2010 |
|
RU2455552C2 |
Authors
Dates
2006-07-27—Published
2004-11-18—Filed