FIELD: mining, particularly lining tunnels, galleries or other underground cavities.
SUBSTANCE: method involves drilling bore-holes in mine sections juncture areas and installing supporting girder. The boreholes are drilled for depth l calculated from l=C+Δl, where C is mine rock slip zone, which characterizes rock destruction degree, Δl is next bore-hole section nearest to mine rock slip zone C and having length, which is 20-30% exceeds rock slip zone C length in dependence of side mine rock strength, m. The girder composed of at least two members provided with orifices is installed by inserting girder member ends in end bore-holes and connecting above ends with each other by means of clamps with nuts and straps. After installation of girder remaining behind mine face and spaced a distance defined by mine roof rock stability from mine face bore-holes are drilled in mine rock through girder orifices and girders are pressed to mine roof with the use of bolts inserted in the bore-holes.
EFFECT: increased efficiency due to improved roof supporting conditions.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
MINE ROOF BOLTING | 2006 |
|
RU2311535C1 |
METHOD FOR SUPPORT OF MINE WORKINGS | 1992 |
|
RU2042032C1 |
METHOD FOR REINFORCEMENT OF MINES | 2012 |
|
RU2495247C1 |
METHOD OF SUPPORT OF MINE WORKINGS (VERSIONS) | 2002 |
|
RU2214511C1 |
METHOD FOR SUPPORT OF EXTRACTION DRIFTS | 1994 |
|
RU2069758C1 |
METHOD FOR SUPPORT OF MINE WORKINGS | 1994 |
|
RU2069759C1 |
REINFORCEMENT METHOD OF MINE WORKINGS WITH ANCHOR SUPPORT | 2010 |
|
RU2430237C1 |
METHOD FOR MINE LINING | 2004 |
|
RU2308599C2 |
SUPERIMPOSED HIGHLY GAS-BEARING COAL BED SERIES DEVELOPMENT METHOD | 2005 |
|
RU2282030C1 |
METHOD FOR CONDUCTING MINING WORKS IN DEVELOPMENT OF FLAT COAL BEDS | 2022 |
|
RU2805691C1 |
Authors
Dates
2006-08-20—Published
2005-01-17—Filed