FIELD: mining.
SUBSTANCE: method for reinforcement of mines includes the following: in a reinforced part of the mine into a deck (7), installed on a working deck (5) on runs (6), pneumatic balloons (8 and 9) are arranged, where a beam (3) and braces (4) are placed. For this purpose runs are moved to the mine bottomhole, and in individual stand (11) is installed. Compressed air is supplied to pneumatic balloons (8), and beams are lifted with a brace to the level of beams of permanent support, and the brace is put on the permanent support frame. Then a thrust is created between beams of the support and mine roof, simultaneous supply of compressed air into pneumatic balloons (8 and 9). Stands are fixed to beams, and the brace is laid along the perimeter of the mine. Afterwards the pneumatic balloons are unloaded, the stand is removed, and runs with the working face, deck and pneumatic balloons are moved to the reinforced space of the mine.
EFFECT: increased efficiency and safety of preparatory mines reinforcement.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
MINE WORKING LINING METHOD | 2009 |
|
RU2418170C1 |
METHOD FOR CONSTRUCTION AND SUPPORT OF MINES UNDER COMPLICATED MINING AND GEOLOGICAL CONDITIONS | 2011 |
|
RU2487242C1 |
METHOD FOR CARRYING OUT AND FIXING OF MINE WORKINGS IN SEVERE MINING AND GEOLOGICAL CONDITIONS | 2009 |
|
RU2426885C1 |
METHOD OF THREW OUT AREA SUPPORTING | 2010 |
|
RU2451181C1 |
PROTECTION METHOD OF REUSABLE DEVELOPMENT WORKINGS | 2011 |
|
RU2472935C1 |
PROTECTION METHOD OF DEVELOPMENT DRIFTS | 2009 |
|
RU2407892C1 |
METHOD TO FIX OPENINGS | 2009 |
|
RU2439328C2 |
METHOD OF TIMBERING OF DEVELOPMENT EXCAVATIONS | 2007 |
|
RU2338880C1 |
PROTECTION METHOD OF DEVELOPMENT DRIFTS | 2007 |
|
RU2339817C1 |
METHOD OF REPAIRING MINE WORKING IN SALT DEPOSITS | 2009 |
|
RU2405111C1 |
Authors
Dates
2013-10-10—Published
2012-05-04—Filed