FIELD: mining industry, namely, finishing stage of construction of methane-coal wells.
SUBSTANCE: in accordance to method, productive bed is opened a second time. Well borehole is washed when second opening is finished. Hydro-disruption of productive bed is performed. Well borehole is washed after hydro-disruption. Lifting column is lowered into well borehole containing underground equipment and down-pump. Well mouth is pressurized and well is finalized by lowering level of liquid in borehole by means of down-pump. Second opening of productive bed is realized by cutting away a part of product column and cement ring behind it, positioned oppositely to product bed. After finishing second opening of productive bed, performed serially are operations concerning expansion of open well borehole in productive bed, creation of two vertical slits in it, directed towards maximal mountain stress in productive bed. Filter is mounted inside the operation column after finishing washing of well borehole after second opening of productive bed.
EFFECT: increased efficiency of finishing process for methane-coal well due to improved conditions of hydro-disruption and significant decrease of mudding degree in face-adjacent zone of productive bed.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMPLETION OF METHANE-COAL WELL | 2004 |
|
RU2288350C2 |
METHOD OF DEVELOPING METHANE-COAL WELL | 2011 |
|
RU2467162C1 |
UNDERGROUND EQUIPMENT WITH DEVICE FOR CLEANING OF SETTLING WELL OF METHANE-COAL HOLE DURING ITS DEVELOPMENT AND MAINTENANCE | 2008 |
|
RU2382176C1 |
CLEANING METHOD OF SUMP OF COAL-METHANOL WELL AND MOUNTING ASSEMBLY FOR INSTALLATION OF BEARING SLEEVE IN PRODUCTION CASING | 2009 |
|
RU2393335C1 |
FORMATION METHOD OF VERTICALLY DIRECTED FRACTURE AT HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION | 2011 |
|
RU2510456C2 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
METHOD FOR DEVELOPMENT OF RESERVOIR NON-UNIFORM BY PERMEABILITY FROM ROOF TO SOLE, SATURATED WITH OIL AND UNDERLYING WATER | 2021 |
|
RU2778703C1 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
METHOD OF BURIAL OF PULPY DRILLING WASTES IN DEPOSIT DEVELOPMENT BY BOREHOLE SYSTEMS | 2001 |
|
RU2196884C2 |
Authors
Dates
2006-11-27—Published
2004-12-27—Filed