FIELD: mining.
SUBSTANCE: underground equipment includes assembly of borehole pump descended into hole using production tubing. Steady bush is located in production string below holing zone. Mechanism of compensation of axial displacement of assembly of borehole pump is connected to sludge trap by its lower end, and by upper end - to mentioned assembly through tail filter. Sludge trap in the form of hollow casing with bottom, open from above, is installed airtight on steady bush by its upper part. Underground equipment is located in production string below holing zone after descending into hole and airtight installation of sludge trap by its upper part on steady bush.
EFFECT: speeding and simplification of process of installation and removal of sludge trap due to exclusion of jobs related to round trip of fishing tool, possibility of creation of more considerable pressure drawdown on productive stratum, that is especially important for methane-coal holes during their development and maintenance.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CLEANING METHOD OF SUMP OF COAL-METHANOL WELL AND MOUNTING ASSEMBLY FOR INSTALLATION OF BEARING SLEEVE IN PRODUCTION CASING | 2009 |
|
RU2393335C1 |
METHOD FOR COMPLETION OF METHANE-COAL WELL | 2004 |
|
RU2288350C2 |
METHOD FOR FINISHING A METHANE-COAL WELL | 2004 |
|
RU2288349C2 |
METHOD OF DEVELOPING METHANE-COAL WELL | 2011 |
|
RU2467162C1 |
STORAGE HOLD | 2010 |
|
RU2447263C1 |
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2010 |
|
RU2471065C2 |
METHOD FOR SELECTIVE ANALYSIS OF SEPARATE FORMATIONS OF COAL-METHANOL WELLS | 2015 |
|
RU2578143C1 |
DEVICE FOR CONSTRUCTION OF GRAVEL-PRECOAT FILTER | 2012 |
|
RU2514077C2 |
WELL DEVELOPMENT METHOD AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2018 |
|
RU2698354C1 |
WELL JET PLANT FOR SELECTIVE TESTING OF FORMATIONS | 2016 |
|
RU2631580C1 |
Authors
Dates
2010-02-20—Published
2008-08-11—Filed