FIELD: mining.
SUBSTANCE: to the production casing, before sludge trap and liner filter is installed in it and submersible pump is arranged, on the pipe string there lowered is the mounting assembly with the bearing sleeve arranged inside it. Then bearing sleeve is installed and fixed in the production column below the interval of its perforation. After that the pipe string with the mounting assembly is removed from the well. Sludge trap, liner filter and submersible pump with flow column is lowered to the well. Sludge trap is arranged tightly on the bearing sleeve. Submersible pump with flow column is removed from the well together with sludge trap. Design of mounting assembly provides for the mandrel with the main radial channels overlapped in initial position with an annular stop installed in the mandrel. Annular stop is made in the form of bearing sleeve and elastic split ring installed in annular groove made on external side surface of bearing sleeve. Shaped piston is provided with axial channel and seat in lower part for waste member, installed in the mandrel and interacts with annular stop. Sealing cup is attached to upper part of bearing sleeve and seals the annular space between bearing sleeve and inner wall of production column. There is retainer of initial position of annular stop and control device of fixation of annular stop in the coupling joint.
EFFECT: arrangement of underground equipment below perforation interval in production column as far as the opening and transition to development of top productive beds is performed.
9 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
UNDERGROUND EQUIPMENT WITH DEVICE FOR CLEANING OF SETTLING WELL OF METHANE-COAL HOLE DURING ITS DEVELOPMENT AND MAINTENANCE | 2008 |
|
RU2382176C1 |
STORAGE HOLD | 2010 |
|
RU2447263C1 |
METHOD FOR FINISHING A METHANE-COAL WELL | 2004 |
|
RU2288349C2 |
METHOD AND DEVICE FOR ADJUSTABLE INJECTION OF FLUID TO LAYERS WITH AUTOMATED MEASURING OF PROCESS PARAMETERS | 2015 |
|
RU2610484C9 |
METHOD OF DEVELOPING METHANE-COAL WELL | 2011 |
|
RU2467162C1 |
METHOD FOR SEALING A PRODUCTION STRING | 2017 |
|
RU2669646C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
METHOD FOR COMPLETION OF METHANE-COAL WELL | 2004 |
|
RU2288350C2 |
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION | 2016 |
|
RU2614998C1 |
DEVICE FOR CONSTRUCTION OF GRAVEL-PRECOAT FILTER | 2012 |
|
RU2514077C2 |
Authors
Dates
2010-06-27—Published
2009-04-10—Filed