FIELD: construction, particularly to remove bulged areas in membrane roofing made of several web material layers.
SUBSTANCE: method involves cutting crossing grooves over the full membrane roofing surface to be repaired, wherein the grooves provide discharge of residual air and moisture from bulged roofing areas into atmosphere; installing steam removing members in the grooves, filling the grooves with powder material and laying new web material layer over existent ones.
EFFECT: prevention of membrane roofing bulging during roof usage.
3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MEMBRANE ROOF REPAIRING | 2003 |
|
RU2247203C1 |
METHOD FOR RESTORATION REPAIR OF ROOF COVERING | 1995 |
|
RU2143535C1 |
METHOD OF ELIMINATING BULGES IN ROOFS | 0 |
|
SU889815A1 |
PLANT TO RECOVER SOFT ROOF | 2011 |
|
RU2485263C2 |
METHOD OF MANUFACTURING MATERIAL FOR ROOFING COATINGS | 2002 |
|
RU2299898C2 |
METHOD FOR REPAIRS OF ROOF COVERINGS | 1990 |
|
RU2024702C1 |
METHOD FOR PROTECTION OF WATER-PROOFING CARPET FROM SWELLING IN REPAIR AND ARRANGEMENT OF ROOFING | 1994 |
|
RU2081976C1 |
WATER-TIGHTNESS RECOVERY METHOD FOR WATERPROOFING BUILDING STRUCTURE COATING | 2005 |
|
RU2287046C2 |
METHOD FOR RECONSTRUCTION OF COMBINED ROOF | 2008 |
|
RU2393309C2 |
METHOD OF MATERIAL MELTING | 2014 |
|
RU2554998C1 |
Authors
Dates
2007-01-10—Published
2005-08-02—Filed