FIELD: railway transport; signaling and communication.
SUBSTANCE: invention relates to voice track circuits. Proposed track circuit has generator 14, rail line, matching transformers, first rectifier 15, resistor 13, first analog-to-digital converter 16, track receiver and it is additionally furnished with change-over device 12, second rectifier 18, second analog-to-digital converter 19 and computer. Rail lines are connected through transformers with inputs/outputs of change-over device to inputs of which track generator is connected through resistor. Input of first rectifier is connected to poles of resistor, said rectifier being connected through first analog-to-digital converter to first input of computer, to second input of which output of change-over device is connected through second analog-to-digital and second rectifier. Output of computer is connected to input of change-over device.
EFFECT: improved serviceability of track circuit at reduced insulation resistance.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
RAIL LINE CHECKING METHOD | 2004 |
|
RU2278044C2 |
METHOD OF CHECKING NON-OCCUPANCY OF TRACK SECTIONS | 2004 |
|
RU2267431C2 |
METHOD OF CHECKING NON-OCCUPANCY OF TRACK SECTIONS | 2004 |
|
RU2268185C2 |
METHOD OF CONTROLLING INTEGRITY OF RAIL THREADS BY THE RATIO OF CURRENT VALUES IN RAILS | 2019 |
|
RU2706607C1 |
UNIVERSAL METHOD FOR CONTROLLING RAIL LINES | 2017 |
|
RU2671604C1 |
DEVICE FOR MONITORING TRACK FILLING | 0 |
|
SU1787849A1 |
METHOD OF TRAINS CONTROL AND TRACK SECTIONS CONDITION MONITORING DEVICE FOR IMPLEMENTATION THEREOF | 2020 |
|
RU2739086C1 |
METHOD TO MONITOR CONDITIONS OF STATION RAIL CIRCUITS | 2019 |
|
RU2725312C1 |
METHOD FOR INTEGRITY CONTROL OF RAIL IN THE ABSENCE OF GALVANIC BREAK AT FRACTURE POINT | 2019 |
|
RU2712361C1 |
METHOD FOR REGULATION OF HIGH-SPEED TRAIN TRAFFIC | 2021 |
|
RU2772592C1 |
Authors
Dates
2007-04-10—Published
2005-08-08—Filed