FIELD: construction, particularly arrangements in buildings for the disposal of refuse.
SUBSTANCE: refuse chute for multistory building comprises shaft with loading gates at each story and damping device, which reduces gravitational speed of solid refuse loaded in the chute. The damping device is installed along chute axis at intermediate building story and retained with support. The damping device is shaped as semi-loop smoothly bending from chute shaft axis. The semi-loop has diameter and flexure equal to shaft diameter. The semi-loop is formed of separate singly-type branches provided with flanges to connect sections with each other, refuse chute and support.
EFFECT: decreased gravitational speed of solid refuse and, as the result, decreased noise propagation over building and improved safety, as well as increased simplicity and reliability and reduced costs.
3 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
GRAVITY SPEEDBRAKE FOR FALLING SOLID DOMESTIC WASTE IN REFUSE CHUTE OF HIGH-RISE BUILDING | 2002 |
|
RU2224859C2 |
REFUSE CHUTE FOR HIGH-RISE RESIDENTIAL OR PUBLIC BUILDINGS | 2002 |
|
RU2224858C2 |
MODERNIZED GARBAGE CHUTE OF MULTI-STOREY BUILDING | 2016 |
|
RU2619288C1 |
GATE FOR RUBBISH CHUTE | 2011 |
|
RU2469161C2 |
REFUSE CHUTE OF MULTISTORY BUILDING | 1998 |
|
RU2129641C1 |
METAL REFUSE CHUTE FOR MULTISTORY RESIDENTIAL AND PUBLIC BUILDINGS | 2004 |
|
RU2257450C1 |
REFUSE CHUTE OF MULTISTOREY BUILDING | 1999 |
|
RU2170313C2 |
ATTACHED ELEVATOR FOR RECONSTRUCTED MULTI-STOREY BUILDING | 2007 |
|
RU2347873C1 |
METHOD OF SEPARATE SELECTION OF COMPONENTS OF DOMESTIC WASTES IN MULTI-STOREY BUILDINGS | 2018 |
|
RU2670004C1 |
SYSTEM AND METHOD FOR SEPARATE GARBAGE COLLECTION | 2022 |
|
RU2797925C1 |
Authors
Dates
2007-07-10—Published
2005-07-27—Filed