FIELD: blasting operations for production of preset mining extraction contours without a considerable dislocation of the rock mass continuity beyond the rated profile, applicable in mining industry and construction.
SUBSTANCE: the contour deep-hole charge includes formation of a string of elements 1 of explosive 2 and initiation. The string is formed from the deep-hole bottom in single polymeric branch 3 in the form of cylindrical elements 1 of explosives 2 of a similar height and diameter formed by pinch 4 of branch 3 and being spaced at distance ld=le(ρedech 2/ρechddh 2-l) cm, where le - the length of the cylindrical element of the string of the contour explosive charge, cm; dech - the diameter of the cylindrical element of the string of the contour explosive charge, cm; ddh - the deep-hole diameter, cm; ρe - the explosive density, g/cu. cm; ρech - the density of deep-hole loading by explosive, q/cu. cm. Initiation is effected by detonating cord 8 fastened with one end on the lower end face of last cylindrical element 1 in the bottom section of the explosive passing along the charge column in the form of alternating linear sections 9 between explosive cylindrical elements 1 and binder assemblies 10 of each explosive cylindrical element 1 in diameter.
EFFECT: enhanced efficiency of contour blasting due to simplified method for formation of the contour charge, expanded assortment of the explosive, reduced cost.
7 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PERFORMANCE OF BLAST-HOLE DRILLING WORKS IN FLOODED WELLS | 2007 |
|
RU2333460C1 |
METHOD FOR CONDUCTING OF DRILLING AND BLASTING OPERATIONS (MODIFICATIONS) | 2006 |
|
RU2304758C1 |
METHOD FOR LOADING WATERED RISING WELLS | 2008 |
|
RU2362970C1 |
METHOD OF CHARGING OF FLOODED DOWNCAST WELLS WITH WATER-CONTAINING EXPLOSIVES | 1995 |
|
RU2088893C1 |
PROCESS OF BREAKING OF ROCKS ON EARTH SURFACE BY BLAST | 1995 |
|
RU2095746C1 |
METHOD FOR FORMING CONTOUR CHARGES FROM EMULSION EXPLOSIVES | 2018 |
|
RU2672078C1 |
MOBILE PLANT FOR PRODUCTION OF EXPLOSIVES (VERSIONS) | 2008 |
|
RU2373172C1 |
METHOD OF CHARGING WATER PRODUCING WELLS WITH BULK SOLID HYDROLABILE EXPLOSIVE SUBSTANCES (VERSIONS) | 2007 |
|
RU2341767C1 |
HOSE FOR CHARGING FLOODED WELLS WITH LOW-DENSITY EXPLOSIVE COMPOSITION | 2024 |
|
RU2824083C1 |
METHOD FOR CONTOUR DESTRUCTION OF FRACTURED ROCKS WITH PRELIMINARY CONTOURING | 2024 |
|
RU2827216C1 |
Authors
Dates
2007-08-20—Published
2006-02-02—Filed