FIELD: oil production, particularly to produce heavy viscous and paraffin-resin crude oil.
SUBSTANCE: device comprises production string with working orifices and pipeline. Pipeline is arranged inside production string in well penetrating oil-bearing reservoir and water-bearing layer. The pipeline is provided with one-way valve and check valve. Working orifices are aggregated in two groups, namely in upper and lower ones. The working orifice groups are opposite to oil-bearing reservoir and water-bearing layer correspondingly. Space between production string and pipeline is separated over oil-bearing reservoir and water-bearing layer with upper and lower packers correspondingly. Pipeline has seat located over one-way and check valves. The seat provides air-tight plunger pump cylinder installation so that the cylinder communicates with oil-bearing reservoir through upper working orifice group, check valve and pipeline interior for heated oil transfer. Pipeline interior may be communicated with water-bearing layer through lower working orifice group by means of one-way valve as plunger pump is lifted over the seat.
EFFECT: prevention of heat-carrier contact with well product due to product extraction by means of sucker-rod pump, increased efficiency of product heating inside well and decreased heat-carrier preconditioning costs.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
HIGHLY-VISCOUS OIL PRODUCTION DEVICE | 2005 |
|
RU2305763C1 |
HEAVY VISCOUS OIL PRODUCTION DEVICE | 2005 |
|
RU2298089C1 |
HIGHLY-VISCOUS OIL PRODUCTION DEVICE | 2005 |
|
RU2305761C1 |
DEVICE FOR EXTRACTING HEAVY VISCOUS OIL | 2005 |
|
RU2299980C1 |
METHOD FOR INTENSIFYING THE PRODUCTION OF RESERVOIR PRODUCTS WITH BOTTOM WATER (OPTIONS) | 2021 |
|
RU2769027C1 |
METHOD FOR OIL EXTRACTION FROM WATERING WELLS AND DEVICE REALIZING SAID METHOD | 2001 |
|
RU2228433C2 |
METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289685C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
METHOD FOR EXTRACTING LAYER-ZONE-WISE HETEROGENEOUS FORMATION OF HIGHLY VISCOUS OIL OR BITUMEN | 2006 |
|
RU2295030C1 |
METHOD OF OPERATION OF A MULTIPLATE UNDERGROUND GAS STORAGE | 2017 |
|
RU2655259C1 |
Authors
Dates
2007-09-10—Published
2005-12-29—Filed