FIELD: mining, particularly bore mining of rock, potassium and other salt deposits by salt dissolving.
SUBSTANCE: method involves drilling vertical well in chamber body to be cut; casing the well; providing the well with concentric water-supply, brine-lifting and production strings; injecting pressurized solvent via pipe space defined by water-supply and brine-lifting strings; delivering nonsolvent via pipe space defined by water-supply and production strings; creating developing entry; supplying solvent with inert filler and producing brine via brine-lifting pipe. The inert filler is peat or oat husk taken in amount of 20-50% of solvent volume and having particle dimensions of not more than half of thickness of pipe space between water-supply and brine-lifting strings.
EFFECT: increased intensity of solvent saturation during operational chamber washing-out, increased simplicity and decreased power inputs due to reduced number of saturation cycles.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BRINE PRODUCTION | 2002 |
|
RU2212531C1 |
METHOD OF EXTRACTING WASTES FROM UNDERGROUND CHAMBERS | 2009 |
|
RU2424968C1 |
METHOD OF FORMATION OF UNDERGROUND RESERVOIRS IN BEDS OF ROCK SALT | 2008 |
|
RU2357076C1 |
METHOD FOR UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2003 |
|
RU2236578C1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK-SALT FORMATIONS | 2003 |
|
RU2236579C1 |
PROCESS OF UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2002 |
|
RU2224104C1 |
METHOD OF FORMING RESERVOIRS IN ROCK SALT FORMATIONS AND DEVICE TO THIS END | 2011 |
|
RU2477702C2 |
DEVICE FOR CORRECTING RESERVOIR SHAPE IN ROCK SALT FORMATIONS | 2011 |
|
RU2465448C1 |
METHOD FOR CONSTRUCTING UNDERGROUND VESSELS IN ROCK SALT DEPOSITS | 2023 |
|
RU2815404C1 |
METHOD FOR EXTRACTING SALTS FROM SALT DEPOSITS | 2002 |
|
RU2229591C1 |
Authors
Dates
2007-09-20—Published
2006-04-19—Filed