FIELD: drilling and blasting operations, applicable in various branches using blasting operations in hard rock masses.
SUBSTANCE: the method consists in separation of an explosive charge into parts by an air gap from foam polystyrene. The air gap of the rated height is formed by dipping of a bulk of foam polystyrene into a borehole, it is tightly packed in a cloth or polyethylene casing with a diameter not exceeding 0.8 of the borehole diameter with a weighting compound in the lower part from pieces of rock or borehole slime with a thickening bulk of explosive on it placed in a soft or elastic casing with a diameter not exceeding the borehole diameter.
EFFECT: simplified forming of air gap from foam polystyrene in an explosive charge.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMING OF AIR GAPS BY ELEMENTS OF FOAM POLYSTYRENE | 2006 |
|
RU2317519C1 |
METHOD FOR FORMATION OF AIR GAPS BY ELEMENTS OF FOAM POLYSTYRENE | 2006 |
|
RU2319922C2 |
METHOD FOR FORMATION OF AIR CAPS OF FOAM PLASTIC | 2006 |
|
RU2322647C1 |
METHOD OF CHARGE DISPERSAL IN WELL | 2006 |
|
RU2325617C2 |
METHOD FOR FORMATION OF DISPERSED EXPLOSIVE CHARGE IN WELL | 2019 |
|
RU2726014C1 |
METHOD OF FORMING DIVIDED CHARGES IN FLOODED WELLS | 2006 |
|
RU2306523C1 |
METHOD OF FORMING DIVIDED CHARGES IN FLOODED WELLS | 2006 |
|
RU2306522C1 |
METHOD FOR FORMATION OF AIR GAPS IN EXPLOSIVE CHARGE | 2006 |
|
RU2319923C1 |
METHOD FOR FORMING OF SPACE-CHARGE OF EXPLOSIVES IN PARTIALLY FLOODED HOLES | 2006 |
|
RU2310158C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES WITH STONE MATERIAL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563265C1 |
Authors
Dates
2008-01-10—Published
2006-03-27—Filed