FIELD: drilling and blasting operations in rock masses.
SUBSTANCE: proposed method of forming the divided charges in flooded wells includes forming the lower and upper parts of explosive charge in well at air gap dividing them. Then, elastic envelope with weighting material and chemical reagents evolving gas at interaction inside it is lowered into water above lower part of explosive charge. After elastic envelope has been filled with gas, upper part of explosive charge is formed above it. Mass of weighting material is so selected that negative buoyancy of elastic envelope partially filled with gas might be ensured. Amount of chemical reagents is so selected that elastic envelope filled with evolved gas might take preset height in explosive charge.
EFFECT: enhanced efficiency due to availability of gas gap in explosive charge formed in flooded well.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMING DIVIDED CHARGES IN FLOODED WELLS | 2006 |
|
RU2306523C1 |
METHOD FOR FORMING OF AIR GAPS FROM FOAM POLYSTYRENE | 2006 |
|
RU2314487C1 |
METHOD FOR FORMING OF CHARGES WITH AIR GAPS | 2006 |
|
RU2314488C1 |
METHOD FOR FORMATION OF DISPERSED EXPLOSIVE CHARGE IN WELL | 2019 |
|
RU2726014C1 |
METHOD FOR FORMING OF SPACE-CHARGE OF EXPLOSIVES IN PARTIALLY FLOODED HOLES | 2006 |
|
RU2310158C1 |
METHOD OF CHARGE DISPERSAL IN WELL | 2006 |
|
RU2325617C2 |
METHOD FOR DISPERSAL OF CHARGE IN WATERED WELL AND DEVICE FOR ITS REALISATION | 2008 |
|
RU2374603C1 |
METHOD TO FORM MULTICHARGE IN DROWNED WELL | 2010 |
|
RU2449241C1 |
METHOD FOR FORMATION OF AIR CAPS OF FOAM PLASTIC | 2006 |
|
RU2322647C1 |
VARIABLE-DIAMETER BOREHOLE CHARGE FOR LOOSENING OF ROCKS | 2014 |
|
RU2572260C1 |
Authors
Dates
2007-09-20—Published
2006-02-07—Filed