FIELD: mining, particularly to perform stripping and mining in pits with 6-8 crushing index.
SUBSTANCE: method involves filling previously created trench with rock loosened with milling machine, wherein loosened rock is poured in the trench from which said rock had been excavated. In the case of conveyer deactivation device usage rock is left in open trench just after rock cutting with milling means. After that rock is scooped with scrapers following pit machine without pit machine stopping.
EFFECT: increased open-pit work efficiency due to decreased milling machine downtime during rock mining.
2 cl, 1 ex, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPEN-PIT MINING OF MINERAL DEPOSITS USING SURFACE MINERS | 2022 |
|
RU2790308C1 |
METHOD OF OPEN PIT MINING WITH HELP OF WHEEL-TYPE MINERS, SELF-PROPELLED HOPPERS AND DUMP TRUCKS | 2013 |
|
RU2517262C1 |
METHOD OF COMBINED DEVELOPMENT OF DEPOSITS OF SOLID MINERALS | 2017 |
|
RU2653213C1 |
METHOD OF DEVELOPMENT OF SOLID MINERAL FIELDS USING EXCAVATING MILLING MACHINE AND SCRAPERS | 2014 |
|
RU2555181C1 |
METHOD FOR STEEPLY-DIPPING SOLID MINERAL DEPOSITS DEVELOPMENT | 2016 |
|
RU2630023C1 |
METHOD OF LAYER BY LAYER MINING OF COMPLEX-STRUCTURE DEPOSITS OF SOLID MINERALS | 2016 |
|
RU2634150C1 |
METHOD OF OPEN DEVELOPMENT OF DEPOSITS OF SOLID MINERAL RESOURCES | 2014 |
|
RU2558051C1 |
METHOD OF OPEN DEVELOPMENT OF COMPLEX STRUCTURAL DEPOSITS OF SOLID MINERALS | 2018 |
|
RU2687213C1 |
METHOD FOR OPEN PIT MINERAL MINING | 2004 |
|
RU2282721C2 |
METHOD OF OPENCAST MINING OF STEEP ELONGATED MINERAL DEPOSITS | 1999 |
|
RU2171377C2 |
Authors
Dates
2008-02-20—Published
2006-06-15—Filed