FIELD: construction of pipelines.
SUBSTANCE: method comprises laying load-bearing members on the ground and packing the soil around the load-bearing members.
EFFECT: enhanced reliability.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
ROAD STRUCTURE | 2006 |
|
RU2312181C1 |
PIPELINE COMBINED LAYING METHOD | 2006 |
|
RU2329428C2 |
METHOD TO ERECT DIKE DAM ON ARCTIC SEA SHORE | 2011 |
|
RU2453653C1 |
METHOD TO CONSTRUCT SOIL STRUCTURE ON WATERLOGGED AREA | 2011 |
|
RU2465387C1 |
METHOD TO REPAIR ROAD SECTIONS FROM PULVERESCENT, WATERED SOILS | 2011 |
|
RU2456399C1 |
METHOD FOR RECULTIVATION OF EARTH CONSTRUCTION IN THE FAR NORTH | 2002 |
|
RU2216889C2 |
EMBANKMENT OF THE RAILROAD ON PERMAFROST SOILS | 2017 |
|
RU2657310C1 |
METHOD FOR CONSOLIDATION OF ROADBED BASE OF HIGHLY ICY GROUNDS | 1990 |
|
RU1764371C |
METHOD FOR CONSTRUCTING SUBGRADE OF ADDITIONAL TRACK ON WEAK BASE IN CASE OF THAWING | 2021 |
|
RU2795020C1 |
METHOD OF LAYING ABOVE-GROUND PIPELINES ALONG MOTOR ROAD IN PERMAFROST areas | 1985 |
|
SU1295855A1 |
Authors
Dates
2008-02-20—Published
2006-03-31—Filed