FIELD: construction.
SUBSTANCE: method to construct a soil structure on a waterlogged area includes erection of a discharge system from soil strengthened with a binder, for instance, oil, layerwise filling of the main part of the structure, laying an underlying layer and a coating onto its surface. Under significant hydraulic heads of surface waters at the structure, within the discharge system they erect horizontal waterproof and filtering rolls with height of 0.3…0.5 m. Then the main part of the structure is filled in layers, and simultaneously the discharge system is erected in the form of perpendicularly arranged waterproof and filtering vertical membranes.
EFFECT: higher reliability and life of structure service, reduced material intensity and labour intensiveness of structure erection.
2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT DIKE DAM ON ARCTIC SEA SHORE | 2011 |
|
RU2453653C1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
ROAD STRUCTURE | 2006 |
|
RU2312181C1 |
METHOD OF LAYING PIPELINES ON GROUND | 2006 |
|
RU2317466C1 |
METHOD FOR PROTECTING TERRITORY FROM FLOODING | 2000 |
|
RU2176700C1 |
PIPELINE COMBINED LAYING METHOD | 2006 |
|
RU2329428C2 |
METHOD TO REPAIR ROAD SECTIONS FROM PULVERESCENT, WATERED SOILS | 2011 |
|
RU2456399C1 |
METHOD FOR PROTECTION OF FROZEN BASE OF EMBANKMENT FROM NEGATIVE IMPACT OF FLOODING | 2020 |
|
RU2753329C2 |
METHOD FOR COMBINED DUMPING OF TAILINGS AND OVERBURDEN ROCKS | 0 |
|
SU1714028A1 |
EARTHWORK ON SWAMPS WITH SUPPORT GROUND CARTRIDGE OF WIDENED TYPE | 2015 |
|
RU2594379C1 |
Authors
Dates
2012-10-27—Published
2011-05-13—Filed