FORMATION HYDRAULIC FRACTURING METHOD (OPTIONS) AND COUPLING FOR ITS IMPLEMENTATION Russian patent published in 2022 - IPC E21B43/26 E21B34/10 

Abstract RU 2765186 C1

FIELD: oil and gas industry.

SUBSTANCE: group of inventions relates to the oil and gas industry, namely to methods for hydraulic fracturing of a productive formation (fracking) in boreholes. The method includes the descent in the casing of at least one hydraulic fracturing coupling consisting of a cylindrical body with radial holes in which plugs with bursting membranes and covers are installed, into a given interval of the borehole, cementing of the backwater space. Before assembling the coupling, the membranes are manufactured with the ability to withstand a pressure no less than 7% greater than the pressure of the casing crimping. Each lid is equipped with a central hole, which excludes the leakage of viscous liquid pumped into the cavity of the plug when descending into the well. The viscosity of the liquid in reservoir conditions, the thickness and diameter of the hole in the lid are selected so that after the rupture of the membrane, this liquid flows out through the hole, and the lid does not collapse at a pressure lower than the pressure of the hydraulic fracturing after cementing. The opening of the formation is carried out in two stages, at the first of which pressure is created to destroy the membrane, but less than the pressure of hydraulic fracturing, and at the second stage the pressure of hydraulic fracturing, including acid, with the destruction of the cover of the cement stone and hydraulic fracturing. Hydraulic fracturing is created by means of a double packer with spaced cuffs and a perforated branch pipe between them, the cuffs of which ensure the creation of a sealed cavity in the area of the corresponding hydraulic fracturing coupling, which is lowered into the well to the installation site of the hydraulic fracturing coupling on the pipe column.

EFFECT: scope of application is expanding, including at high reservoir pressure and/or low permeability, reliability increases due to rupture of at least 95% of membranes, high-quality cementing of the casing string is provided.

4 cl, 5 dwg

Similar patents RU2765186C1

Title Year Author Number
COUPLING FOR HYDRAULIC FACING IN A WELL 2021
  • Miller Ivan Arkadevich
  • Sekisov Andrej Vasilevich
  • Khajrullin Bulat Yusupovich
RU2765351C1
FORMATION IN THE WELL INTERVAL BY INTERVAL MULTI-STAGE HYDRAULIC FRACTURING PERFORMANCE METHOD AND A DEVICE FOR ITS IMPLEMENTATION 2018
  • Korabelnikov Mikhail Ivanovich
  • Korabelnikov Aleksandr Mikhajlovich
RU2682391C1
COUPLING FOR HYDRAULIC FACING IN A WELL 2021
  • Miller Ivan Arkadevich
  • Khomutovskij Vyacheslav Vladimirovich
  • Sekisov Andrej Vasilevich
  • Khajrullin Bulat Yusupovich
RU2765365C1
METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING 2021
  • Shamsutdinov Nikolaj Maratovich
  • Milkov Aleksandr Yurevich
  • Elshin Aleksandr Sergeevich
  • Leontev Dmitrij Sergeevich
RU2775628C1
HYDRAULIC FRACTURE PORT INSERT AND HYDRAULIC FRACTURING SLEEVE WITH FRACTURE PORT INSERT 2023
  • Paleev Anton Rafaelevich
  • Tulaev Aleksandr Igorevich
RU2798549C1
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION 2019
  • Ismagilov Fanzat Zavdatovich
  • Lutfullin Azat Abuzarovich
  • Khusainov Ruslan Fargatovich
RU2724705C1
DEVICE FOR WELL COMPLETION 1994
  • Rakhimkulov R.Sh.
  • Afridonov I.F.
  • Popov A.M.
  • Farrakhov N.V.
RU2091564C1
METHOD FOR ISOLATION OF WATERED INTERVALS IN HORIZONTAL SECTION OF WELLBORE 2016
RU2611792C1
DRILLING-IN METHOD 0
  • Gadzhiev Bakhman Abysh Ogly
  • Kirsh Boris Aleksandrovich
  • Vechkhajzer Leonid Isaevich
SU1754886A1
METHOD OF INJECTING INTO WELLS 1994
  • Afridonov I.F.
  • Ovtsyn I.O.
  • Asfandijarov R.T.
  • Rakhimkulov R.Sh.
RU2109128C1

RU 2 765 186 C1

Authors

Dates

2022-01-26Published

2021-03-23Filed