FIELD: construction, particularly to straighten buildings and building structures erected on foundation slabs.
SUBSTANCE: method involves removing ground from under foundation bottom; digging-out trenches in obtained recess; filling the trenches with compacted ground and installing posts with supports in trenches so that gaps are left between foundation bottom and posts; performing repeated ground compaction under foundation bottom along with ground shifting in direction opposite to building inclination; providing at least partial filling of spaces between foundation bottom and posts with non-compressible material; consolidating ground under post supports by binding material injection in ground.
EFFECT: increased efficiency and reliability of building and building structure straightening.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HEELING COMPRESSION OF BUILDINGS CONSTRUCTED ON WATER - SATURATED GROUNDS | 2007 |
|
RU2348760C1 |
METHOD TO ELIMINATE DEFORMATIONS OF BRIDGE CROSSING ABUTMENTS | 2011 |
|
RU2481433C1 |
METHOD TO REINFORCE STRUCTURE FOUNDATION BASES | 2011 |
|
RU2472899C1 |
METHOD FOR WATER-SATURATED GROUND CONSOLIDATION | 2005 |
|
RU2301299C2 |
METHOD FOR REDUCTION OF DEFORMATIONS OF MOTOR AND RAILWAY ROADS ON PERMAFROST SOILS THAT THAW OUT IN PROCESS OF OPERATION | 2013 |
|
RU2536538C1 |
METHOD FOR LEVELLING NON-UNIFORMLY SETTLED BASE PLATE OR THREE-DIMENSIONAL SOLID FOUNDATION BLOCK | 2013 |
|
RU2545207C1 |
METHOD OF ELIMINATING BOILS IN SOIL BED OF OPERATED AUTOMOTIVE AND RAILWAY ROADS ON SEASONAL FROST PENETRATED SOILS | 2011 |
|
RU2471928C1 |
METHOD FOR DEFORMATION PREVENTION IN FOUNDATIONS BUILT ON PERMAFROST GROUND | 2004 |
|
RU2270295C2 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 |
|
RU2391464C2 |
Authors
Dates
2008-03-10—Published
2006-04-04—Filed