FIELD: construction, particularly to straighten buildings and building structures erected on foundation slabs.
SUBSTANCE: method involves removing ground from under foundation bottom; digging-out trenches in obtained recess; filling the trenches with compacted ground and installing posts with supports in trenches so that gaps are left between foundation bottom and posts; performing repeated ground compaction under foundation bottom along with ground shifting in direction opposite to building inclination; providing at least partial filling of spaces between foundation bottom and posts with non-compressible material; consolidating ground under post supports by binding material injection in ground.
EFFECT: increased efficiency and reliability of building and building structure straightening.
3 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF HEELING COMPRESSION OF BUILDINGS CONSTRUCTED ON WATER - SATURATED GROUNDS | 2007 | 
 | RU2348760C1 | 
| METHOD TO ELIMINATE DEFORMATIONS OF BRIDGE CROSSING ABUTMENTS | 2011 | 
 | RU2481433C1 | 
| METHOD TO REINFORCE STRUCTURE FOUNDATION BASES | 2011 | 
 | RU2472899C1 | 
| METHOD FOR WATER-SATURATED GROUND CONSOLIDATION | 2005 | 
 | RU2301299C2 | 
| METHOD FOR REDUCTION OF DEFORMATIONS OF MOTOR AND RAILWAY ROADS ON PERMAFROST SOILS THAT THAW OUT IN PROCESS OF OPERATION | 2013 | 
 | RU2536538C1 | 
| METHOD FOR LEVELLING NON-UNIFORMLY SETTLED BASE PLATE OR THREE-DIMENSIONAL SOLID FOUNDATION BLOCK | 2013 | 
 | RU2545207C1 | 
| METHOD OF ELIMINATING BOILS IN SOIL BED OF OPERATED AUTOMOTIVE AND RAILWAY ROADS ON SEASONAL FROST PENETRATED SOILS | 2011 | 
 | RU2471928C1 | 
| METHOD FOR DEFORMATION PREVENTION IN FOUNDATIONS BUILT ON PERMAFROST GROUND | 2004 | 
 | RU2270295C2 | 
| METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 | 
 | RU2382146C1 | 
| METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 | 
 | RU2391464C2 | 
Authors
Dates
2008-03-10—Published
2006-04-04—Filed