FIELD: methods of underground mining, particularly to prepare permafrost roof rock for initial caving.
SUBSTANCE: method involves drilling belt entry and air way; cutting mounting chamber at excavation pillar boundary; installing mining complex and applying mechanical and thermal action to roof rock. As belt entries and air ways are cut slots are made in seam roof beginning from distance measured from excavation pillar boundary equal to expected initial caving increment. The slots extend for depth of not less than 1.5 m with slot plane inclination to horizontal plane of not less than 45°. After slot cutting hot air from local heaters is supplied into the slots.
EFFECT: decreased initial roof caving increment and increased safety along with equipment breakage elimination.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DIFFICULT-TO-CAVE ROOF PREPARATION FOR INITIAL CAVING | 2005 |
|
RU2312219C2 |
METHOD OF PRIMARY COLLAPSE-PROOF ROOF CAVING PREPARATION IN PERMAFROST ENVIRONMENT | 2006 |
|
RU2331766C1 |
METHOD FOR DEVELOPMENT OF SERIES OF CONTIGUOUS BEDS OF CRYOLITHIC ZONE COAL | 2011 |
|
RU2478787C2 |
METHOD FOR CONTROLLING PRIMARY CAVING OF HARD-DESTRUCTIBLE CEILING | 2002 |
|
RU2235878C1 |
METHOD FOR ROOF ROCK DISPLACEMENT MEASUREMENT IN PERMAFROST ZONE CIRCUMSTANCES | 2006 |
|
RU2310750C2 |
METHOD OF DIFFICULT-TO-CAVE ROOF CONTROL IN MINING OF COAL SEAMS BY POWERED MINING SET | 1996 |
|
RU2151293C1 |
COMPLEX METHOD OF PRELIMINARY DEGASSING OF WORKING COAL BED, WORKED-OUT AREA AND ACCOMPANYING BEDS AND CONTROLLED CAVING OF HEAVY ROOF | 2013 |
|
RU2540750C2 |
METHOD OF CONTROLLING DIFFICULT-TO-CAVE ROOF | 2000 |
|
RU2177546C1 |
METHOD FOR FORMATION OF CAVING SLOT IN STOPE ROOF | 1992 |
|
RU2039263C1 |
PROCESS OF DEVELOPMENT OF THICK GENTLY DIPPING COAL FORMATIONS WITH ROOF ROCKS DIFFICULT TO FALL | 2002 |
|
RU2219341C1 |
Authors
Dates
2008-03-27—Published
2006-03-27—Filed