FIELD: mining.
SUBSTANCE: method includes development of beds with longwalls along the strike using mechanised complexes. For this purpose during development of each underlying bed a longwall is arranged so that the remaining coal sight pillars near ventilation and conveyor drifts of the overlying bed are above the middle part of the extraction column, and extraction of coal beds is carried out in descending order.
EFFECT: higher safety of development of contiguous beds and lower labour inputs for roof management.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PARTING PREPARATION FOR FURTHER DEVELOPMENT OF COAL BEDS LOCATED ONE NEAR ANOTHER IN PERMAFROST ZONE | 2004 |
|
RU2280162C2 |
METHOD OF COMBINED MINING OF SERIES OF CONTIGUOUS BEDS | 2001 |
|
RU2211331C2 |
METHOD OF MINING OF THICK INCLINED OUTBURST-PHONE SEAM | 1998 |
|
RU2143074C1 |
METHOD FOR CONTROL OF GAS EMISSION IN MINING FORMATION OF COAL SEAMS | 1997 |
|
RU2118458C1 |
METHOD OF CONTROL OF AEROGASDYNAMIC PROCESSES IN MINING OF FORMATION OF COAL SEAMS | 1995 |
|
RU2101499C1 |
DEVELOPMENT METHOD OF THICK STEEP COAL BEDS | 2011 |
|
RU2477795C1 |
METHOD FOR DEVELOPMENT OF SERIES OF CONTIGUOUS COAL BEDS | 2012 |
|
RU2495251C1 |
SAFE MINE FOR GAS-BEARING FIRE-HAZARDOUS SEAM CUTTING | 2006 |
|
RU2310073C1 |
ZOLOTARYOV SAFE COAL MINE | 2009 |
|
RU2422639C1 |
METHOD FOR FILLING OF MINED-OUT SPACE DURING DEVELOPMENT OF GENTLY SLOPING BEDS WITH LONG PILLARS | 2020 |
|
RU2735173C1 |
Authors
Dates
2013-04-10—Published
2011-07-13—Filed