FIELD: oil and gas production, particularly methods or devices for cementing, for plugging holes, crevices, or the like.
SUBSTANCE: device comprises technological pipe string lowered in well and reagent supply unit installed at well head. Technological pipe string is provided with radial channels opposite to penetrated water-bearing reservoir. The radial channels are sealed with hollow bush from inside. The bush is retained with shear member and may perform limited axial sliding in downward direction relatively technological pipe string. Reagent supply unit is made as upper and lower top cementing plugs installed in technological pipe string and retained with lock members so that it may be released and slide downwards in axial direction. Technological pipe string is provided with upper, lower and central supply pipes arranged over, under and between top cementing plugs correspondingly. Lower top cementing plug may cooperate with hollow bush.
EFFECT: increased water-isolation quality and extended water-isolation result duration.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
MIXING DEVICE OF REAGENTS OF TWO-COMPONENT COMPOSITION IN WELL | 2012 |
|
RU2494226C1 |
DEVICE FOR WATERPROOFING OPERATIONS PERFORMING IN WELL | 2006 |
|
RU2314409C1 |
DEVICE TO PERFORM WATERPROOFING WORKS IN WELL | 2006 |
|
RU2306404C1 |
DEVICE TO PERFORM WATERPROOFING WORKS IN WELL | 2006 |
|
RU2310063C1 |
DEVICE FOR WELL WATERPROOFING | 2006 |
|
RU2305753C1 |
DEVICE FOR LINER CEMENTING IN WELL | 2023 |
|
RU2809844C1 |
DEVICE FOR WATERPROOFING OPERATIONS EXECUTING IN WELL | 2006 |
|
RU2309241C1 |
METHOD OF WELL'S HORIZONTAL BOREHOLE PART REPAIR INSULATION WORKS | 2008 |
|
RU2379472C1 |
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS | 2014 |
|
RU2578095C1 |
METHOD FOR WATER INFLUX ZONE ISOLATION INSIDE WELL | 2006 |
|
RU2315171C1 |
Authors
Dates
2008-04-10—Published
2006-05-24—Filed