FIELD: underground well repair, particularly methods to create behind-casing screen in productive reservoir of oil, water and gas wells.
SUBSTANCE: method involves injecting foamed polymeric solution including water-soluble polymer in amount of 1.5-2.5 % by weight, foaming agent in amount of 1-3% by weight, cross-linking foam stabilizing agent in amount of 0.2-0.6% by weight and water in bottomhole formation zone; injecting porous plugging composition including cement grout with 0.3-0.5 water-cement rate taken in amount of 60-80% by weight, above mentioned foamed polymeric solution in amount of 20-40% by weight in bottomhole formation zone. Each of said solutions is characterized by viscosity η and yield point τ change during injection and cross-linkage thereof.
EFFECT: prevention of bottomhole formation zone blocking in slightly cemented reservoirs.
8 cl, 4 tbl, 5 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION WELL REPAIR | 2005 |
|
RU2322569C2 |
METHOD FOR TEMPORARY PRODUCTIVE RESERVOIR INTERVAL PLUGGING | 2005 |
|
RU2306414C2 |
METHOD OF BOTTOM-HOLE REGION LINING | 2010 |
|
RU2467156C2 |
COMPOUND FOR WATER SHUTOFF IN WELL | 0 |
|
SU1802083A1 |
ISOLATION METHOD OF WATER INFLUX TO WELL | 2010 |
|
RU2425957C1 |
METHOD FOR POLYMERIC GEL-FORMING COMPOSITION CHOICE TO INCREASE RESERVOIR RECOVERY AND PERFORM WATERPROOFING WORKS | 2004 |
|
RU2272899C1 |
BEDS ISOLATION FLUID | 0 |
|
SU1710700A1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2011 |
|
RU2469178C1 |
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION | 2019 |
|
RU2740986C1 |
METHOD FOR SELECTIVE ISOLATION OF WATER INFLOWS IN OIL WELLS | 1999 |
|
RU2136879C1 |
Authors
Dates
2008-04-20—Published
2005-12-19—Filed