FIELD: transportation.
SUBSTANCE: device for shunting the rails circuits contains the basic elements attached to the vehicle truck frame, brush assemblies with brushes and spring-loaded lever ties to suspend the brush assemblies. Every such brush assembly incorporates a U-shaped holder. Every brush assembly suspension system incorporates a U-shaped bracket linked to the basic element.
EFFECT: increase in reliability of shunting of rails circuits and increase in safety on railway transport.
5 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND SYSTEM FOR VEHICLE WHEELS CONTACT WITH RAILTRACKS MONITORING | 2013 |
|
RU2540289C1 |
SYSTEM OF TRAIN SEPARATION AT SPANS | 2012 |
|
RU2503564C1 |
RAILWAY VEHICLE BOGIE | 2014 |
|
RU2573100C1 |
DEVICE FOR CONTROL OVER RAIL CIRCUITS SHUNTING | 2013 |
|
RU2547953C1 |
VEHICLE CLEANING POST BASED ON PORTAL CRANE | 2023 |
|
RU2797826C1 |
ARRANGEMENT FOR CLEANING RAILWAY TRACKS | 0 |
|
SU1470847A1 |
TRAIN INTERVAL CONTROL SYSTEM | 2021 |
|
RU2770040C1 |
CARRIER SYSTEM FOR CYLINDRICAL BRUSH SUSPENSION ON SWEEPERS | 2005 |
|
RU2376414C2 |
SYSTEM FOR INTERVAL CONTROL OF MOVEMENT OF TRAINS AT RAILWAY HAUL | 2014 |
|
RU2550795C1 |
TRAIN INTERVAL CONTROL SYSTEM | 2023 |
|
RU2811161C1 |
Authors
Dates
2008-06-20—Published
2006-12-28—Filed