FIELD: equipment for processing railway cross ties.
SUBSTANCE: product line for repair of wooden railway cross ties contains cross-section conveyors for moving cross ties across the longitudinal axis and parallel longitudinal conveyors for moving cross ties along the longitudinal axis. On cross-section conveyors installation on submission of cross ties on one of bulk cross ties is mounted. The equipment for performance in technological sequence of operations on processing cross ties includes the metal detector, installation of clearing of cross ties, installation sawing the ends of cross ties, installation of fastening of cross ties from cleaving, installation of a notch of cross ties and drilling them, installation of pressing and sealing, installation of accumulation of the repaired cross ties. Longitudinal conveyors for moving cross ties along the longitudinal axis are placed in a direction of moving of cross ties across the longitudinal axis by cross-section conveyors. Installation on submission of cross ties on one of bulk cross ties is equipped by devices canting and turn of a cross tie on 90 degrees for the further moving along the longitudinal axis. The equipment for performance in technological sequence of operations on processing cross ties is placed with an opportunity of an interitem reserve between its adjacent units along one of the parallel longitudinal conveyors, equipped by devices of transfer of rejected cross ties on the second parallel longitudinal conveyor supplied by the device of accumulation of rejected cross ties.
EFFECT: the invention allows to use effectively the process equipment of a line due to simultaneous performance of technological operations that raises its productivity, and spatial dimensions of a line promote its accommodation under of crane zone to a zone of the crane serving a line.
3 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOW LINE FOR TIE SPIKES AND ANTI-CRACK BINDING | 2007 |
|
RU2336995C1 |
FLOWLINE FOR PRICKING OF TIES AND PREVENTING THEIR CRACKING | 2003 |
|
RU2249645C1 |
FLOW LINE FOR DEEP PRICKING OF TIES | 2000 |
|
RU2184650C2 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
DEVICE TO PREVENT CRACKING OF TIES | 2003 |
|
RU2249646C1 |
FLOW-LINE FOR ASSEMBLING SECTIONS OF RAIL-AND-SLEEPER UNITS | 1997 |
|
RU2115782C1 |
DEVICE FOR FASTENING TIES TO PREVENT THEIR SPLINTING | 1998 |
|
RU2151835C1 |
Authors
Dates
2008-06-20—Published
2006-10-26—Filed