FIELD: railway.
SUBSTANCE: invention relates to the field of railway transport. The units of technological equipment for the links-disassemble works are placed with the possibility of their stepping movement on the rails of the disassembling link on the cart-satellite with its continuous, low-speed shift with stationary-mounted equipment in the area of units for capturing and storing the bond elements. Bonds are removed in the process of performance of the links-disassemble works.
EFFECT: high-performance, rhythmic and efficient operation of the line is achieved.
1 dwg, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
FLOW LINE FOR ASSEMBLING RAILWAY TRACK SECTIONS | 2004 |
|
RU2260089C1 |
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
RAIL LENGTH ASSEMBLY LINE | 2008 |
|
RU2377357C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2006 |
|
RU2304191C1 |
FLOW LINE TO ASSEMBLE RAIL LENGTHS | 2009 |
|
RU2410484C2 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2005 |
|
RU2304190C1 |
FLOW LINE FOR ASSEMBLING SECTIONS OF TRACK SKELETONS | 2005 |
|
RU2298608C1 |
METHOD TO ASSEMBLE RAIL LENGTHS IN UNPADDED TYPE OF JOINTS | 2010 |
|
RU2437979C1 |
Authors
Dates
2012-02-10—Published
2010-08-25—Filed