FIELD: transport.
SUBSTANCE: method includes using knock-down elements of a bypass road with an invariable track pit in the road centre to be provided to bypass the road incident centre (RIC) on one of the main road sides. The automobile flow if directed into this bypass way till the liquidation of the incident consequences. Then the bypass road is disassembled to be stored till the next incident. The sides of the invariable tract pit are made from an elastic material, while the SHVO width of the inner enveloping part of the bypass road is taken to be equal to at least 3 to 4 golden sections (gs) of length of epicentre (le), i.e. SHVO.=(3-4) gs•le, where gs=1.618.
EFFECT: shorter intervals of the jam elimination.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD DEVELOPED BY LN BURKOV OF ELIMINATION OF MOTOR TRANSPORT CONGESTION AT SUBURB ROADS | 2006 |
|
RU2340948C2 |
METHOD OF BURKOV FOR ELIMINATION OF TRAFFIC JAMS ON MEGACITY HIGHWAYS | 2006 |
|
RU2342482C2 |
AGRICULTURAL COMPLEX-4 OF BURKOV LN DESIGN | 2007 |
|
RU2359442C2 |
HARROW | 2007 |
|
RU2332821C1 |
METHOD OF HIGH-SPEED RAILROAD TRAIN MOTION | 2008 |
|
RU2361759C1 |
EARTHQUAKE-PROOF TUNNEL | 2008 |
|
RU2353731C1 |
THREADED JOINT | 2011 |
|
RU2459125C1 |
METHOD FOR MANAGEMENT OF AGRICULTURAL WORKS AND AGRICULTURAL COMPLEX FOR CARRYING OUT THE SAME | 2003 |
|
RU2262219C2 |
RAIL JOINT OF LN BURKOV DESIGN | 2006 |
|
RU2336385C1 |
METHOD AND DEVICE FOR CONNECTION OF WOODEN ITEMS | 2008 |
|
RU2364689C1 |
Authors
Dates
2008-06-20—Published
2006-11-13—Filed