FIELD: petroleum industry.
SUBSTANCE: invention is referred to petroleum industry and can be applied for development of oil reservoir developed by depletion. Invention ensures higher efficiency of the method due to recovery of oil remaining reserves in the reservoir. The method includes oil recovery by depletion via producing horizontally branched wells, oil being recovered by cyclic operation of all producing wells. When wells are started up, oil is recovered until current reservoir pressure is drawdown to 60-80% of initial reservoir pressure. Wells are shutdown until current reservoir pressure is restored to the value of 70-90% of initial reservoir pressure. If during reservoir development process any of the producing wells fail to restore current reservoir pressure to 70% of initial reservoir pressure, the said producing wells shall be converted to injecting wells with continuous pumping. Oil is recovered from remaining producing wells in the same process.
EFFECT: higher efficiency of oil well production.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL-POOL DEVELOPMENT | 2006 |
|
RU2330946C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 2006 |
|
RU2339800C2 |
METHOD FOR EXTRACTING OIL DEPOSIT | 2005 |
|
RU2287675C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 2008 |
|
RU2354813C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 2008 |
|
RU2354812C1 |
OIL FIELD DEVELOPMENT METHOD | 2005 |
|
RU2282025C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2096593C1 |
METHOD FOR PRODUCTIVE BED DEVELOPMENT | 2005 |
|
RU2282024C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT LOCATED ABOVE GAS DEPOSIT AND SEPARATED WITH NON-PERMEABLE INTERLAYER FROM IT | 2011 |
|
RU2502861C2 |
DEVELOPMENT METHOD OF OIL DEPOSIT IN FRACTURED RESERVOIRS | 2012 |
|
RU2490439C1 |
Authors
Dates
2008-08-20—Published
2006-12-29—Filed