FIELD: constructional engineering.
SUBSTANCE: invention refers to constructional engineering and can be used for building construction and upkeep. Method for damp-proofing of below-grade building includes levelling blanket laid on basement soil, formation of membrane system, formation of protective concrete layer, installation of reinforcing cage, concreting of footing and below-grade filler members. Membrane system is arranged by continuous laying of extended hoses made of polymeric fabrics and fastening them or, alternatively, overlapping at an angle to each other. Hose outflows are placed outside the footing. The footing and below-grade filler members concreted, damp-proof mixture is grouted through outflows to hose cavity pockets to produce impervious beds.
EFFECT: simplified below-grade construction procedure, improved reliability of groundwater protection of both horizontal and vertical footing elements, decreased work content as well as possibility to repair membrane system during building construction and upkeep.
9 cl, 5 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REINFORCING BASEMENT SOIL | 2006 |
|
RU2333318C1 |
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION | 2018 |
|
RU2692396C1 |
CAST-IN-PLACE SUPPORTING STRUCTURE ERECTION METHOD AND CAST-IN- PLACE SUPPORTING STRUCTURE | 2003 |
|
RU2252298C1 |
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD | 2011 |
|
RU2465401C1 |
METHOD FOR ERECTION OF INJECTION DOWEL PIN AND INJECTION DOWEL PIN ERECTED BY THIS METHOD | 2009 |
|
RU2405888C1 |
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
MULTI-LAYER HYDRAULIC INSULATION OF UNDERGROUND STRUCTURE (DEVICE BY P.B. YURKEVICH) | 2013 |
|
RU2539456C2 |
METHOD FOR CONSTRUCTION OF GEOTECHNICAL STRUCTURES IN THE WATER AREA OF URBAN RIVERS AND CANALS | 2022 |
|
RU2791119C1 |
METHOD FOR CREATING A GEOTECHNICAL STRUCTURE IN THE GROUND | 2021 |
|
RU2762373C1 |
Authors
Dates
2008-09-10—Published
2006-11-22—Filed