FIELD: building, particularly for erecting support structures, namely pile foundations, injection anchors, walls in ground, cast-in-place reinforced earth constructions and other geotechnic structures used for new building erection or reconstruction of existent buildings.
SUBSTANCE: method involves forming well or trench section in ground; at least partly filling thereof with hardening material or drilling agent, for instance with cement-bentonite one; substituting thereof with hardening material; immersing reinforcing cage with outer flexible shell connected to at least part of cage length in well. The flexible shell is permeable for liquid fraction of the hardening material and provides waterproofing of the cage after setting of above material and hardening material located outside the shell. Shell parameters are determined from the given correlations.
EFFECT: increased load-bearing capacity, reliability and service life, extended field of application.
24 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
METHOD FOR CONSTRUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2087617C1 |
METHOD OF CONSTRUCTING GROUND ANCHOR AND GROUND ANCHOR ITSELF | 1997 |
|
RU2131495C1 |
METHOD FOR ERECTING BORED SURFACED PILES AND DEVICE FOR IMPLEMENTING THE METHOD | 2020 |
|
RU2754092C1 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
METHOD FOR CREATING A GEOTECHNICAL STRUCTURE IN THE GROUND | 2021 |
|
RU2762373C1 |
METHOD FOR ERECTION OF BUILT-IN-PLACE PILE-SHELL | 2020 |
|
RU2739531C1 |
METHOD OF CONSTRUCTING CAST-IN-PLACE PILE | 0 |
|
SU1368387A1 |
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2100525C1 |
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD | 2011 |
|
RU2465401C1 |
Authors
Dates
2005-05-20—Published
2003-11-12—Filed