FIELD: construction.
SUBSTANCE: method of underpinning of subfoundations erected on the weak water-saturated ground and in a space-limited environment involves charging of a quick-setting cement mortar into the pipes installed in the holes drilled through the foundation support and the ground. The pipes are manufactured of flexible plastic with closed bottom ends, and the middle part of these pipes is equipped with steel pipes located between the foundation base and the layers of the ground with enhanced bearing capability.
EFFECT: underpinning of foundations.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BASEMENT STRENGTHENING | 2006 |
|
RU2334055C1 |
METHOD FOR DEEP TUNNEL OPENING AND REPAIRING | 2004 |
|
RU2263787C1 |
REINFORCEMENT METHOD OF FOUNDATION BASE DURING RECONSTRUCTION OF BUILDINGS AND STRUCTURES | 2019 |
|
RU2708929C1 |
METHOD TO REINFORCE FOUNDATIONS OF BUILDINGS AND STRUCTURES, PRONE TO ACTION OF FORCES OF FROST HEAVING OF SOILS | 2010 |
|
RU2516037C2 |
METHOD TO MAINTAIN INITIAL STRESSED-DEFORMED CONDITION OF SOIL IN ZONE OF EXISTING BUILDING FOUNDATION | 2010 |
|
RU2422592C1 |
METHOD FOR BORED AND CAST-IN-PLACE PILE FORMING ALONG WITH GROUND COMPACTION AT HOLE BOTTOM | 2003 |
|
RU2260654C1 |
METHOD FOR STRENGTHENING OF STRIP FOUNDATIONS | 1995 |
|
RU2105100C1 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 |
|
RU2391464C2 |
METHOD FOR SOIL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2588511C2 |
Authors
Dates
2008-10-10—Published
2006-12-13—Filed