FIELD: building.
SUBSTANCE: invention refers to building, in particular, to strengthening of the bases under the basements. The way of strengthening of the basement erected on waterlogged priming coats and near to the located constructions includes supply of early strength concrete in the metal tubing established in driven wells, drilled through a basic part of the basement and a ground. Pipes are made with the welded boots, in pipes lower explosive charges and fill with early strength concrete, then the explosive charges are detonated, remaining hollownesses of driven wells and pipes are filled with early strength concrete.
EFFECT: provision of reliable strengthening of the basements erected in waterlogged priming coats and near to located constructions; increase of load-carrying capacity.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SUBFOUNDATION UNDERPINNING | 2006 |
|
RU2335602C1 |
METHOD FOR SOIL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2588511C2 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
METHOD FOR BORED AND CAST-IN-PLACE PILE FORMING ALONG WITH GROUND COMPACTION AT HOLE BOTTOM | 2003 |
|
RU2260654C1 |
METHOD FOR DEEP TUNNEL OPENING AND REPAIRING | 2004 |
|
RU2263787C1 |
DRILLING METHOD TO ERECT STRIP FOUNDATION IN WATER-BEARING SOILS | 2010 |
|
RU2415228C1 |
METHOD TO MAINTAIN INITIAL STRESSED-DEFORMED CONDITION OF SOIL IN ZONE OF EXISTING BUILDING FOUNDATION | 2010 |
|
RU2422592C1 |
METHOD OF COMPACTING THE BODY OF SAGGING LOESS SOIL | 0 |
|
SU1351997A1 |
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
Authors
Dates
2008-09-20—Published
2006-11-30—Filed