FIELD: building, pipeline.
SUBSTANCE: invention concerns building of pipelines and is used at laying of underground main pipes. Along the planned line of an underground pipework laying preliminary perform erection of a road design with cutting down and packing on a traffic area of a road design shrubby vegetation from a surface of a strip of tap under the planned trench for the pipeline. Having erected road design, perform dredging from the trench for pipeline packing, thus the ground is dumped on a road verge from an opposite side of the traffic area of the road design in relation to the trench. Lay ready section of the pipeline in a trench, and after its joining with earlier laid pipeline, the ground from a road verge of an opposite side of the traffic area of the road design is moved in an opposite direction with filling of the pipeline trench.
EFFECT: improvement of ecology along the pipeline line.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
BASE OF EARTH STRUCTURE | 1997 |
|
RU2134320C1 |
METHOD OF BUILDING ICY CROSSING | 1996 |
|
RU2112830C1 |
MOORING STRUCTURE | 1998 |
|
RU2136814C1 |
TIE STAY FOR SECURING PIPE LINE | 2001 |
|
RU2187732C1 |
ANCHORING DEVICE FOR SECURING PIPE LINE | 2001 |
|
RU2192576C1 |
ROAD STRUCTURE ON LOOSE GROUND | 1996 |
|
RU2107767C1 |
ARCH BRIDGE | 2001 |
|
RU2209868C2 |
SECTIONAL SUPPORTING STRUCTURE AND METHOD OF ITS ERECTION | 1995 |
|
RU2107768C1 |
LOAD-BEARING SUPPORT STRUCTURE | 2002 |
|
RU2231599C2 |
PROCEDURE FOR PIPELAY | 2010 |
|
RU2436007C1 |
Authors
Dates
2008-11-10—Published
2007-03-23—Filed