FIELD: machine building.
SUBSTANCE: as pipes there are used concrete solidified pipes. A mounting pad is created by lengthwise lay of a lower layer of logs of 14-24 cm diametre tied with dogs, by crosswise lay of logs of 14-24 cm diametre over the lower layer, also tied with wire twisting, and by lay of a brush lining over these two layers. Strings of the pipeline of concrete solidified pipes are arranged on the mounting pad with length not less, than 60 m to facilitates control over quality of weld joints at fabrication of pipeline strings. Strings of the pipeline of concrete solidified pipes are lowered into a trench from a banquette prior to jointing with previously laid strings. A pipe-layer is alternately transferred and the pipeline is supported with erection clothes. Also, allowed height of pipeline string lifting over ground surface is specified as high, as 0.5 m.
EFFECT: expanded functionality of procedure due to reduced limitations for dimensions and weight of pipeline strings at its construction.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAIN PIPE LAYING | 2007 |
|
RU2338112C1 |
METHOD OF ERECTION OF TECHNOLOGICAL PASSAGE ALONG PIPE LINE ROUTE (VERSIONS) AND DEVICE FOR REALIZATION OF THIS METHOD | 2003 |
|
RU2220350C1 |
METHOD OF BUILDING TECHNOLOGICAL PASSAGEWAY ALONG MAINS ROUTE (VERSIONS) | 2003 |
|
RU2221953C1 |
EARTH MODULE OF FOREST MEADOW FOR CONSTRUCTION OF TECHNOLOGICAL PASSAGE ALONG ROUTE OF MANIFOLD PIPELINE | 2008 |
|
RU2353847C1 |
METHOD OF SURFACE PIPELINE CONSTRUCTION IN SWAMPS | 2016 |
|
RU2624937C1 |
METHOD OF BUILDING TECHNOLOGICAL CROSSING OVER OBSTACLE (VERSIONS) | 2003 |
|
RU2221954C1 |
METHOD OF ERECTING METALLIC-TUBE PIPELINE | 0 |
|
SU877204A1 |
METHOD OF ERECTION OF MAIN PIPE LINE ON SLOPE OF MOUNTAINOUS TERRAIN | 2000 |
|
RU2194903C2 |
METHOD AND DEVICE FOR LAYING UNDERGROUND PIPELINE | 2006 |
|
RU2322629C1 |
METHOD AND DEVICE FOR LAYING LINEAR PORTION OF MAIN | 1989 |
|
RU2049947C1 |
Authors
Dates
2011-12-10—Published
2010-05-04—Filed