FIELD: building, pipeline.
SUBSTANCE: invention concerns building of pipeline transport and can be used at a laying of pipelines in drowned and boggy places. Apply a solid layer of thermosetting from a liquid condition material on the pipe. After final consolidation of the layer, the pipe with the applied insulating covering is placed in the form and the second layer of the same thermosetting from a liquid condition material is applied on the first layer by its pouring in the form. After beginning of gelatinisation of the liquid material add metal fraction in it: either metal crumb, or metal powders, or their mix.
EFFECT: possibility of regulation of weight of a weighting compound.
3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF APPLYING BALLAST COATING ON UNDERWATER PIPE | 2003 |
|
RU2257503C1 |
CONNECTION METHOD OF PIPES TO INNER AND OUTER COATINGS, AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2485386C1 |
METHOD OF LOCAL REPAIR OF OPERATING PIPELINE | 2020 |
|
RU2729581C1 |
PROCEDURE FOR PREPARING BALLAST MATERIAL FOR UNDERWATER PIPELINE | 2009 |
|
RU2412393C1 |
METHOD OF PIPELINE REPAIR | 2016 |
|
RU2640132C1 |
METHOD OF CONNECTING PIPES WITH INTERNAL CEMENT-SAND COATING | 2008 |
|
RU2384786C1 |
ELECTRICALLY INSULATING CONSTRUCTION WITH HYDROPHOBIC COATING | 2017 |
|
RU2654076C1 |
METHOD FOR APPLICATION OF COATINGS ON TUBING STRING | 2019 |
|
RU2735438C1 |
METHOD OF COMPLEX CORROSION PROTECTION OF EXTENDED STEEL PIPE LINES (VERSIONS) | 2005 |
|
RU2296817C2 |
PIPELINE UNDERWATER CROSSING REPAIR METHOD | 2018 |
|
RU2693954C1 |
Authors
Dates
2008-11-10—Published
2007-04-06—Filed