FIELD: metallurgy.
SUBSTANCE: method includes hot heading, electrocontact heating of whole rod till temperature Ac3+(50-250)°C with velocity 10-200°C/s and tension with strain 0.1-0.5 kilogram-force /mm2, cooling from this temperature on air till workshop temperature, and also heating for tempering till 250-700°C with velocity 10-200°C/s with soaking 1-15 min and tension 0.5-2 kilogram-force /mm2.
EFFECT: homogeneous structure and fine grain, high and uniform mechanical properties, corrosion stability along the full length and section of rods.
1 ex, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PUMP-COMPRESSOR PIPE TREATMENT | 2008 |
|
RU2379362C1 |
PROCEDURE FOR FABRICATION OF PUMP-COMPRESSOR PIPE | 2009 |
|
RU2418078C1 |
METHOD OF PRODUCTION OF THE PETROLEUM PUMPING RODS | 2005 |
|
RU2270871C1 |
MANUFACTURING METHOD OF PIPES FOR PROCESS NEEDS OF OIL WELLS | 2011 |
|
RU2464327C1 |
METHOD OF PUMP RODS PRODUCTION FOR DEEP-WELL PUMP | 2006 |
|
RU2329129C2 |
METHOD FOR MAKING HEAT HARDENED BLANKS OF PUMP RODS | 1997 |
|
RU2117539C1 |
METHOD FOR PRODUCTION OF LOW-ALLOY ROLLED PRODUCTS OF STRENGTH CATEGORY S390P | 2021 |
|
RU2781928C1 |
METHOD FOR PRODUCTION OF LOW-ALLOYED PLATE WITH INCREASED FIRE RESISTANCE USING A REVERSING MILL | 2022 |
|
RU2799194C1 |
METHOD OF MANUFACTURING CORROSION ROLLED PRODUCT FROM LOW-ALLOY STEEL | 2018 |
|
RU2681074C1 |
THERMOMECHANICAL PIPE TREATMENT METHOD | 2012 |
|
RU2500821C1 |
Authors
Dates
2008-12-10—Published
2006-12-28—Filed