METHOD OF DATAWARE AND CONTROL OF FLUID WITHDRAWAL FROM OIL WELLS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD Russian patent published in 2008 - IPC E21B43/00 E21B47/00 

Abstract RU 2341647 C1

FIELD: mining; engines and pumps.

SUBSTANCE: bottomhole apparatus with pressure, temperature and composition sensors, with resistivity and humidity meters is connected to cable of centrifugal pump and is arranged on section of geophysical cable under centrifugal pump before lowering of column. Further at lowering of production tubing the second bottomhole apparatus with pressure and temperature sensors is assembled at a specified distance above the centrifugal pump. Then communication channels are connected via the cable line with a well control system; they are assembled over producing reservoir in a borehole of vertical or inclined well. To commands of the control unit there are performed measurements of specified parameters and current time by means of a surface complex of apparatus including the control unit, a pumping assembly control station and a gauge unit of surface parameters. Obtained data are registered into memory, values are displayed on indication unit and data are transmitted via communication channels to the control unit to commands of which the surface control unit forms and transmits signals to the pump assembly control station facilitating optimisation of the process of well operation.

EFFECT: upgraded accuracy of controlled parameters with optimisation of control process and operation.

6 cl, 1 dwg, 5 ex

Similar patents RU2341647C1

Title Year Author Number
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION 2014
  • Nikolaev Oleg Sergeevich
RU2562641C2
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) 2014
  • Savich Anatolij Danilovich
  • Chernykh Irina Aleksandrovna
  • Shadrunov Anton Anatol'Evich
  • Shumilov Aleksandr Vladimirovich
RU2571790C1
DOWN-HOLE TESTING AND MEASURING COMPLEX AND METHOD FOR ITS INSTALLATION IN HORIZONTAL WELL 2012
  • Nikolaev Oleg Sergeevich
  • Nikishov Vjacheslav Valer'Evich
  • Timonov Aleksej Vasil'Evich
  • Sergejchev Andrej Valer'Evich
  • Smetannikov Anatolij Petrovich
  • Bajkov Vitalij Anvarovich
  • Volkov Vladimir Grigor'Evich
  • Slivka Petr Igorevich
  • Erastov Sergej Anatol'Evich
  • Gabdulov Rushan Rafilovich
RU2487238C1
DOWNHOLE DEVICE FOR TRANSMITTING INFORMATION FROM DOWNHOLE SENSORS DURING OPERATION OF WELL WITH SUBMERSIBLE PUMP 2024
  • Nurullin Ilnar Zagfiarovich
  • Tagirov Rustam Islamovich
RU2821882C1
METHOD FOR STUDYING DIRECTIVE AND HORIZONTAL WELLS DURING PUMPING OPERATION 2023
  • Chudnovskij Aleksej Aleksandrovich
  • Chukhustov Aleksandr Dmitrievich
  • Shiryaev Evgenij Olegovich
  • Rybka Valerij Fedorovich
  • Kozhevnikov Igor Pavlovich
RU2810764C1
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS 2014
  • Malykhin Igor' Aleksandrovich
RU2552555C1
DEVICE FOR OPERATION OF WELL, EQUIPPED BY ELECTRICAL CENTRIFUGAL PUMP 2009
  • Khisamov Rais Salikhovich
  • Gabdullin Timerkhatmulla Gabdullovich
  • Gabdullin Shamil' Timerkhatmullovich
  • Ibragimov Nail' Gabdulbarievich
  • Karjagin Dmitrij Viktorovich
  • Tomus Jurij Borisovich
  • Fajzullin Ilfat Nagimovich
RU2386807C1
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION 2013
  • Slivka Petr Igorevich
  • Gabdulov Rushan Rafilovich
  • Erastov Sergej Anatol'Evich
RU2531011C1
METHOD TO INVESTIGATE BEDS IN PROCESS OF OIL AND GAS WELLS DRILLING AND SAMPLER FOR ITS REALISATION 2012
  • Malyuga Anatolij Georgievich
RU2492323C1
INFORMATION SUPPORT SYSTEM FOR OIL FIELD DEVELOPMENT 1993
  • Savich A.D.
  • Sementsov A.A.
  • Semenov B.A.
RU2077735C1

RU 2 341 647 C1

Authors

Savich Anatolij Danilovich

Shumilov Aleksandr Vladimirovich

Baldin Anatolij Valentinovich

Chernykh Irina Aleksandrovna

Dates

2008-12-20Published

2007-03-15Filed