FIELD: mining.
SUBSTANCE: cable consists of one or several isolated leads coated with one or two, or three pairs of armored layers and with exterior polymer coating; also each layer of exterior pair is executed with lay length equal to 8÷12 multiple diameter of laid layer with gaps between wires providing 60-70% filling of layer from close laying, while rest free part (30-40%) of both layers of armor of exterior pair is filled with polymer material of exterior coating.
EFFECT: increased tear resistance of cable on a whole and adhesion hardness of polymer coating to surface of wires of exterior pair of armor; increased corrosion protection of cable from aggressive well fluid.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
GEOPHYSICAL CABLE FOR EXPLORATION OF INCLINED AND HORIZONTAL BOREHOLES | 2003 |
|
RU2248594C1 |
TWIST-RESISTANT ARMORED CABLE FOR GEOPHYSICAL INVESTIGATIONS OF WATER AREAS, GAS AND OIL WELLS | 2004 |
|
RU2285965C2 |
REINFORCED POLYMERIC SHEATH COVERED GEOPHYSICAL LOAD-CARRYING CABLE AND ITS APPLICATION PROCESS | 2003 |
|
RU2269834C2 |
SEPARATION METHOD OF TWISTED PRODUCTS INTO ELECTRICAL STRAND IN POLYMER SHEATH, STEEL WIRE AND PROCESSING OF STEEL WIRE PIECES INTO REINFORCEMENT ELEMENTS | 2012 |
|
RU2507279C1 |
ROPE-CABLE WITH LIGHT-WEIGHT PLASTIC CORE TO HANDLE CARGOES AND CHEMICAL REAGENTS IN OIL AND GAS WELLS | 2007 |
|
RU2372431C2 |
GEOPHYSICAL CABLE ( VARIANTS ) AND METHOD OF INVESTIGATION OF WELLS | 1998 |
|
RU2138834C1 |
LOAD-CARRYING LOGGING CABLE ( VARIANTS ) AND PROCESS OF INVESTIGATION OF INCLINED AND HORIZONTAL WELLS | 2002 |
|
RU2209450C1 |
METHOD OF TWISTED ITEMS SEPARATION INTO CURRENT-CONDUCTING CORE, STEEL WIRING AND RELATED CUTTING THEM INTO REINFORCEMENT ELEMENTS | 2010 |
|
RU2453940C2 |
GEOPHYSICAL CABLE (OPTIONS) AND THE WELLS RESEARCH METHODS | 2017 |
|
RU2696363C2 |
METHOD OF REWORKING WASTES OF CABLE PRODUCTS | 2004 |
|
RU2288960C2 |
Authors
Dates
2009-01-20—Published
2007-10-29—Filed