FIELD: construction, pipeline.
SUBSTANCE: invention is related to construction of pipeline transport and may be used in installation of pipelines on water basin bottoms and in swampy area. Pipe assembled with shell and plugs is laid on location plate, concrete pipeline is connected to holes in plugs, and ballast material is supplied in the form of moving concrete mixture by pump into annular space until is filled, then concrete pipeline is disconnected from openings.
EFFECT: expansion of technical facilities arsenal.
5 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPLEX FOR PIPE BALLASTING IN SHELL | 2007 |
|
RU2345271C2 |
METHOD TO APPLY BALLAST MATERIAL ONTO SURFACE OF PIPE FOR UNDERWATER PIPELINE | 2008 |
|
RU2413117C2 |
PIPELINE COMPLEX HEAT INSULATION AND BALLASTING DEVICE | 2023 |
|
RU2823680C1 |
METHOD OF APPLYING BALLAST COATING ON UNDERWATER PIPE | 2003 |
|
RU2257503C1 |
COMBINED PIPE AND CONCRETE APPLICATION DEVICE | 2009 |
|
RU2418224C2 |
PIPE WITH CONCRETE COATING AND METHODS FOR PRODUCTION THEREOF | 2014 |
|
RU2596298C2 |
METHOD AND DEVICE OF CONCRETE APPLICATION ONTO PIPE | 2009 |
|
RU2418225C2 |
METHOD FOR MANUFACTURING BALLAST PIPE | 2010 |
|
RU2450193C1 |
COMBINED PIPE WITH BALLAST COATING | 2006 |
|
RU2317469C1 |
PROCEDURE FOR MANUFACTURE OF SULPHATE RESISTANT HEAVY-WEIGHT PIPE | 2010 |
|
RU2435094C1 |
Authors
Dates
2009-01-27—Published
2007-03-19—Filed