FIELD: heating systems, drying.
SUBSTANCE: invention can be used when utilising industrial wood residue. Dried raw material is put into pyrolysis chamber 1. Into drying chamber 2 live wood is put. Industrial wood residue supplied to silo 26 is fed to gas-generating furnace 5 with screw feeder 14. Gases generated in gas-generating furnace 5 are supplied via gas duct to pyrolysis chamber 1. At wood warming-up stage there supplied is generator gas, with the help of gas blower 4, from pyrolysis chamber 1 through outlet branch pipe 27 and condenser 3 to burner device 7, where it is burning. Flue gases appearing during generator gas burning provide for an additional heating of raw material through pyrolysis chamber 1 wall. After that flue gases are supplied to drying chamber 2 through outlet branch pipe 31 of combustion chamber 6.
EFFECT: improving process efficiency and reducing operating costs.
1 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| CHARCOAL KILN | 2013 | 
 | RU2574051C2 | 
| CHARCOAL KILN | 2004 | 
 | RU2256686C1 | 
| PLANT FOR PRODUCTION OF CHARCOAL | 2011 | 
 | RU2468061C2 | 
| PLANT FOR DISPOSAL OF FIRE-DAMAGED FOREST AND WASTE WOOD | 2012 | 
 | RU2515670C2 | 
| METHOD FOR PRODUCING CHARCOAL AND COMPLEX FOR PRODUCING CHARCOAL | 2022 | 
 | RU2808872C1 | 
| CHARCOAL KILN | 1994 | 
 | RU2081148C1 | 
| MOBILE CHARCOAL COMPLEX UVK-M | 2014 | 
 | RU2567959C2 | 
| APPARATUS FOR PRODUCING OF FUEL CHARCOAL | 2002 | 
 | RU2236435C2 | 
| PLANT FOR CHARCOAL PRODUCTION | 2010 | 
 | RU2429273C1 | 
| WOOD COAL PRODUCTION DEVICE | 2016 | 
 | RU2628602C1 | 
Authors
Dates
2009-02-10—Published
2007-05-17—Filed