FIELD: construction industry.
SUBSTANCE: invention refers to construction industry, and namely to construction of town underground shallow objects. Method of connecting horizontal or inclined reinforced concrete bored piles to vertical ones at underground shallow objects involves zero platform design, vertical reinforced bored piles arranged within the shallow object area, reinforced concrete plate with openings, which is arranged on the bored piles, subsequently down-going earth excavation within each layer, sub-grading at the level of the next flooring, indentation in vertical bored piles, placing some part of flooring reinforcement in indentation, and flooring concreting. In reinforcement cage of bored pile, before the latter is lowered into the well, above or below future indentation there rigidly fixed is a through element, e.g. a piece of tube with the compression strength that is not lower than compression strength of concrete taken out for indentation. Future connection points to the flooring are restricted from above and from below by filling those with easy-removable material e.g. foam plastic or foam plexus, or erection foam, etc., which is removed on the next layer.
EFFECT: reducing labour cost, and improving safe work when attaching vertical reinforced concrete elements to horizontal ones.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONNECTING AUGER PILE WITH SOLID FLOOR OF UNDERGROUND STRUCTURE | 2017 |
|
RU2643231C1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND MULTISTOREY BUILDINGS | 2015 |
|
RU2604098C1 |
METHOD FOR ERECTION OF BORED PILES PACKET | 2007 |
|
RU2351710C1 |
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION | 2003 |
|
RU2244067C1 |
METHOD FOR ARRANGEMENT OF BORED PILES PACKET | 2007 |
|
RU2352719C1 |
METHOD FOR ERECTION OF UNDERGROUND STRUCTURES | 1997 |
|
RU2094567C1 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND | 2006 |
|
RU2317375C2 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD FOR BORED AND CAST-IN-PLACE PILE FORMING IN GROUND HAVING SILTY INTERLAYERS | 2004 |
|
RU2260653C1 |
Authors
Dates
2009-03-27—Published
2007-07-24—Filed