FIELD: construction, road engineering.
SUBSTANCE: invention is related to construction and may be used in construction of transport roads and bridge supports. Unit of geoweb connection to retaining wall blocks comprises lattice connector having hook end and finger-shaped element joined with hook end, geoweb link having hole produced by transverse and longitudinal ribs, and pair of blocks with surfaces adjacent in height, from the side of which at least in one block indent is provided, at that hook end of lattice connector is installed in block indent, and finger-shaped element of lattice connector is connected to one of transverse ribes of geoweb link via its hole. Geoweb link hole is arranged as elliptical, lattice connector - in the form of finger-shaped element with power part on one end and grippers-like claw - on the other one. Grippers-like claw via hole in geoweb link is connected to its transverse rib, lattice connector and mentioned transverse rib of geoweb link are installed in block indent, and at least one longitudinal rib of geoweb link is withdrawn through power part of finger-shaped element of lattice connector. Lattice connector is also suggested.
EFFECT: increased reliability of structure elements connection, accuracy of assembly, reduced labour intensiveness.
9 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
ROAD EMBANKMENT WITH RETAINING WALL, METHOD OF RETAINING WALL ERECTION AND REINFORCED CONCRETE BLOCK FOR RETAINING WALL ERECTION | 2004 |
|
RU2276230C1 |
METHOD FOR CONSTRUCTING A VERTICAL SLOPE OF A ROAD EMBANKMENT AND A RETAINING BLOCK FOR IMPLEMENTING SUCH A METHOD | 2021 |
|
RU2765408C1 |
FLAT MALLEABLE GEOWEB | 2018 |
|
RU2686554C1 |
ANTI-LANDSLIDE STRUCTURE FOR REINFORCEMENT OF ROAD EMBANKMENTS ON UNSTABLE SLOPES | 2019 |
|
RU2728046C1 |
METHOD FOR REINFORCEMENT OF SOIL | 2011 |
|
RU2482244C2 |
SHAPING ELEMENT OF ARMOR GROUND STRUCTURE | 2022 |
|
RU2784264C1 |
BREAST WALL | 0 |
|
SU1813142A3 |
METHOD OF REINFORCEMENT OF LOOSE GROUNDS OF BASES AND SLOPES (VERSIONS) AND GEO-GRATE FOR REALIZATION OF THIS METHOD | 2003 |
|
RU2228479C1 |
REINFORCED GROUND STRUCTURE AND METHOD FOR ITS CONSTRUCTION | 2022 |
|
RU2791847C1 |
ARTIFICAL TRENCH FOR MAIN PIPELINE, METHOD OF ITS BASE CONSTRUCTION (VERSIONS), BASE (VERSIONS), AND DEVICE FOR BASE CONSTRUCTION | 2007 |
|
RU2340824C1 |
Authors
Dates
2009-04-27—Published
2006-10-11—Filed