FIELD: mining.
SUBSTANCE: method consists in simultaneous extraction with cuts and in transfer reloading of overburden into worked out space on three horizons divided with beds of mineral. Also the first dragline is assembled on the roof of an upper production bench to transfer rock of an upper stripping bench onto working platforms of lower production horizons by upper excavating and at withdrawing run. The second dragline is assembled on the roof of the lower production bench for final forming of internal dump, mining of the second and third stripping benches and for pile of re-excavation with an advance run.
EFFECT: increased efficiency of deposit development and of stripping equipment operation; facilitation of reliable operation of production excavators.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPENED DEVELOPMENT OF SUPERIMPOSED MINERAL DEPOSIT BEDS | 2004 |
|
RU2276268C2 |
OVERBURDEN DEVELOPMENT METHOD | 2014 |
|
RU2563517C1 |
OPENCAST MINING METHOD FOR HORIZONTAL AND GENTLY PITCHING DEPOSITS | 0 |
|
SU1740671A1 |
METHOD OF DEVELOPING BEDDED DEPOSITS WITH DRAG-LINES | 2015 |
|
RU2584334C1 |
METHOD FOR EXTRACTING STRIPPING ROCK | 2005 |
|
RU2299985C2 |
METHOD FOR OPEN-CUT MINING OF MINERAL DEPOSITS | 2017 |
|
RU2642903C1 |
METHOD FOR OPENCAST MINING BLANKET DEPOSITS | 2002 |
|
RU2235205C2 |
MINING OF BEDDED DEPOSITS | 2014 |
|
RU2570067C1 |
METHOD FOR OPENED BEDDED DEPOSIT DEVELOPMENT | 2005 |
|
RU2303695C1 |
METHOD OF OPEN MINING OF ADJOINING HORIZONTAL MINERAL BEDS | 0 |
|
SU1528909A1 |
Authors
Dates
2009-06-27—Published
2008-03-25—Filed