FIELD: mining.
SUBSTANCE: cut in the board is arranged across in direction of the mineral bulk dump and is divided into three sections over the length. First, extreme cut sections are worked which abut on its end boundaries. Note here that mineral is displaced beyond the worked board contours limits. Stripping rock is dumped into worked space between lengthwise boundaries.
EFFECT: higher process efficiency owing to increase in that of excavation and transfer equipment.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING BEDDED DEPOSITS WITH DRAG-LINES | 2015 |
|
RU2584334C1 |
DIRECT MINING METHOD | 2013 |
|
RU2537309C1 |
COMBINED METHOD FOR OPENCAST MINING OF NARROW STRETCHING OUT HORIZONTAL AND SLIGHTLY INCLINED MINERAL DEPOSITS | 1992 |
|
RU2016196C1 |
METHOD FOR OPENED DEVELOPMENT OF SUPERIMPOSED MINERAL DEPOSIT BEDS | 2004 |
|
RU2276268C2 |
METHOD OF OPEN DEVELOPMENT OF BEDDED DEPOSIT OF MINERALS | 2008 |
|
RU2360118C1 |
METHOD OF CONDUCTING STRIPPING WORK | 0 |
|
SU1097794A1 |
METHOD TO MINE BED DEPOSITS | 2012 |
|
RU2490464C1 |
METHOD FOR DRAINAGE DEVELOPMENT OF PLACERS | 2018 |
|
RU2681168C1 |
METHOD FOR OPENCAST MINING OF SLOPING AND STEEP DEPOSITS OF MINERALS | 1997 |
|
RU2148713C1 |
METHOD FOR OPEN-CUT MINING OF MINERAL DEPOSITS | 2017 |
|
RU2642903C1 |
Authors
Dates
2015-12-10—Published
2014-12-04—Filed