FIELD: mining.
SUBSTANCE: invention refers to construction of platforms for extraction of minerals. The procedure consists in constructing the central and peripheral sea platforms; each platform is constructed with a base plate rigidly tied with solid soil by means of cement piles; a semi-submerged module with process equipment is mounted on the base plate directly or through a foundation with a sunken upper deck; the sea platforms are connected with pipelines and with a coast compressor station. The semi-submerged nodules with process equipment are replaceable, specialised and self-propelled, for example, in form of a catamaran. The specialised semi-submerged modules are replaced accordingly to the process, while the base is made with supports from unified sections connected between them rigidly.
EFFECT: invention increases reliability of equipping deposits of minerals.
6 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF MARINE PROCESS COMPLEX | 2009 |
|
RU2405084C1 |
METHOD FOR ERECTION OF MULTI-SUPPORT TECHNOLOGICAL PLATFORM | 2007 |
|
RU2361039C2 |
METHOD FOR MARINE PRODUCTION COMPLEX ERECTION | 2006 |
|
RU2307893C1 |
METHOD FOR MARINE GAS-FIELD DEVELOPMENT | 2005 |
|
RU2296836C1 |
METHOD FOR OFFSHORE PLATFORM ERECTION | 2004 |
|
RU2280128C1 |
METHOD OF CONSTRUCTING PROCESS PLATFORMS | 2007 |
|
RU2347866C2 |
METHOD FOR PROCESSING PLATFORM ERECTION | 2006 |
|
RU2307894C1 |
METHOD FOR CONSTRUCTING ARCTIC PLATFORM | 2003 |
|
RU2238365C1 |
METHOD OF ARRANGEMENT OF ARCTIC TECHNOLOGICAL COMPLEX | 2005 |
|
RU2288994C1 |
PROCESS OF ERECTION OF DEEP-SEA PLATFORM | 2002 |
|
RU2229556C1 |
Authors
Dates
2009-08-10—Published
2007-11-23—Filed